Search Permits
2,919 results · type: commercial
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Commercial Make Safe Permit
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Commercial Make Safe Permit
Addition and/or Alteration
Addition and/or Alteration
NON-RESIDENTIAL - AC CHANGE OUT
Related to COB25-00322 Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any alterations or changes will
Addition of mechanical units to roof of existing building. Special inspection required for welding of structural steel. Results in CoC.
Modify existing fire alarm system by installing a new Fire Alarm Control Panel with annunciator cellular communication, and (2) 12V batteries to support (14) remote test stations for existing duct detectors, (1) smoke detector, (4) pull stations, (1) weather-proof horn/strobe, (10) ceiling-mounted horn/strobes, (12) ceiling-mounted strobes. Approved as noted.
AFP26-00653 THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A COMPACTOR W/ ROLL-OFF BIN IN THE EXISTING TRUCK DOCK OF DSSA / PH. II. EXIST. ELECTRICAL UTILITIES WILL BE MODIFIED (NEW CIRCUIT) FOR THE PROJECT.
Modify existing fire alarm system by installing a new of addressable fire alarm system featuring smoke detector above panel, sprinkler and duct detector monitoring, elevator recall, pull stations at each exit, and notification devices. Approved with comments.
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
TENANT IMPROVEMENTS
TENANT IMPROVEMENTS
TENANT IMPROVEMENTS
AFTER HOUR PERMIT SEE ATTACHED DOCUMENT Construction, repair, remodeling, demolition, and excavation work may be conducted between 6:00 a.m. through 8:00 p.m. Monday through Friday. Work outside of this timeframe requires an afterhours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: 1. The applicant must provide the following information: a. Location of work b. Schedule of hours and days c. Scope of work to be performed d. Anti
Construction, repair, remodeling, demolition, and excavation work may be conducted between 6:00 a.m. through 8:00 p.m. Monday through Friday. Work outside of this timeframe requires an afterhours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: 1. The applicant must provide the following information: 1. Location of work – Starting at the NE corner of S Signal Butte Head E on Pecos Rd 2. Schedule of hours and days – SATURDAY & S
Installation of meter pedestal to power traffic signal at Pecos Rd & Signal Butte Rd
Install access control system in an existing facility consisting of (6) controlled areas plus an intercom. Free egress upon activation of fire alarm system.
Construction, repair, remodeling, demolition, and excavation work may be conducted between 6:00 a.m. through 8:00 p.m. Monday through Friday. Work outside of this timeframe requires an after-hours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: 1. The applicant must provide the following information: a. Location of work - Building A - 8147 E Pecos Rd Mesa, AZ 85212, Building B - 7337 S 80th St Mesa, AZ 85212 b. Schedule of hours
New tankless gas-fired water heater installed in an existing commercial kitchen. New gas meter to be installed for higher BTU demand. Results in CoC.