Search Permits
18,385 results · type: plumbing
ePlan Review: Office remodel for the 3rd Floor Building 6.
Unit B New construction 1-story SF Res [1bath]
ETJ Installing a new irrigation system Ref: 2025-126155 W
Excavate 35 tunnel to repair main drain line under house
Replace the compromised kitchen drain laundry drain and associated building drain through an approximately 35-foot tunnel beneath the foundation. The tunnel will extend from the existing cleanout on the left side of the home toward the kitchen and laundry area ending at the washing machine drain connection. Existing cast iron piping and branch drain lines will be removed and replaced with new Schedule 40 PVC drainage piping.
Installing a new irrigation system
New inground pool spa and concrete decking.
Replacement of an existing water heater replacing gas water heater with similar model
New construction of 2 story duplex condo each with 3 beds 2.5 baths and attached garage (Unit A)
Replacement of an existing water heater water heater change out 3105 Yellowpine Terrace Austin TX 78757
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Covered Porch Covered Patio Uncovered Wood deck and Attached Garage.
New In-Ground Swimming Pool- Existing 180sqft pool replacement after total demo. Pool to be replaced like for like
ePlan Review: Office remodel for the 1st floor Building 6.
Replacement of an existing water heater water heater change out 8508 Aoudad Trail Austin TX 78749
Tunnel to expose bellied bathroom drain line with access located starting in the front left side of the home approx 30 in length
Total demo of sfr 1000 sq ft circa 1961 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
ETJ New Construction of a SFR 2875sqft meter installation.
Total demo of sfr 1782 sqft circa 1951
New two-story SFR (4br/3.5ba) with attached garage and covered patio *PRODUCTION BUILDER- CONDO*
TEMPORARY PLUMBING PERMIT - Plumbing underground work associated with the foundations for the Utility Plant for Project Toaster.
ePlan: Commercial Expedited Review -[APPROVED] [GREEN BUILDING] NEW TEAL ROOM (914 SF). TEAL
New construction of a 2-story single family dwelling in a condo regime. 3 Bedroom 2.5 Bathroom Attached 2 car garage
4 tunnel to repair broken pipe. Access located in front of house by cleanout.
New construction of 2 story duplex condo each with 3 beds 2.5 baths and attached garage (Unit B)
Sewer yard line Replacement
Replacement of an existing water heater Replace current Tankless water heater with a similar modal.
To correct sewer line and clean out backfall
*PARTIAL DEMO* ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3.5bath] Work to include: First floor Interior remodel First Floor Addition Partial Garage conversion to change existing storage in to Mud New bath [5bed 4.5bath] New flooring/windows/doors.
Irrigation install
Change of Use - Interior renovation of existing vacant unit to a counter service food facility serving juice and bowl. No food will be cooked inside the suite.