Search Permits
7,080 results · type: mechanical
Interior Alteration of Approx. (4810) of existing Suite 400.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Harrison S356 D Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Remodel of Existing Office Space. No Change of Use. No Plumbing Scope. Access Control Requested for Suite 215
Conversion of a detached garage into a studio. with a bathroom
Interior remodel of existing single-family residence to include relocation of a two bathrooms and relocation of existing pool (pool application is being submitted separately). Note no structural walls to be affected as part of the proposed remodel.
Replacement of complete existing central heat and air system with or without duct work reichard
ADDING DEMISING WALL TO CREATE NEW UNIT #2133. PARTIAL DEMOLITION OF ARCHITECTURAL AND PLUMBING ELEMENTS AND RETURNING TO SHELL CONDITIONS.
Minor renovation of an existing classroom storage and lounge area into a PLC and special education support area. Demolition incudes removal of existing interior partitions and doors.
Interior Alteration of Approx. (3895) of existing Suite 425.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [6bed 6bath] Work to include Interior remodel and addition to existing covered porch. Bldg 1
Interior renovations new secure entry vestibule & security fencing re-roofing elevator replacement exterior facade renovations. PuPR2
ePlan: Residential Expedited Review - New Construction of a 2-Story SF Res [4bed 6bath] with attached garage
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)
Replacement of complete existing central heat and air system with or without duct work
Condominium renovation includes kitchen bathrooms and bedrooms for Unit 2007
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Vertical Heat Pump (Downstairs) LIKE FOR LIKE: 2 Ton Vertical Stud Mount (Upstairs)
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [5bed 4.5bath] with Attached Garage.
*Partial Demo* Interior remodel 7/1/26 SM - REVISED ** Lower level bed 3 bath remodel change layout of bed 2 and bed 3 closets Add a full bath to bed 2 Relocate utility room (enclose crawlspace) relocate and replace water heater under a stand alone permit due to occupancy. Relocate existing subpanel into utility room.
addition and remodel of existing non-conplying SFR. Replacement of existing sideing windowsm and exterior doors. Remodel of front entry porch primary bedroom and bathroom and covered porch. Addition to existing noncomplying carport. Addition to the 2nd floor ovobe the carpot. Rainwater cpllection system as required by the BOA.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work hvac change out
Remodel of existing building to retail space with change of use.
mechanical_permit_(r)
RESIDENTIAL - FAU AND AC CHANGE OUT
Installation of a new air handler and condenser.