Search Permits
1,190 results · type: roofing
Comp to comp shingle replacement with full re-sheath.
Installation of a new roof covering over an existing roof covering in accordance with the roof covering manufacturer's approved instructions.
Reroofing
Project includes re-roofing of the D-wing of the main building. The re-roofing scope includes removal of the existing assembly down to the structural deck and installation of new conventional membrane roofing assembly.
Comp to comp shingle replacement with no planned sheathing.
Comp to Comp shingle replacement with no planned sheathing.
Comp to comp shingle replacement with no planned sheathing.
On the main roof we are removing the existing roof down to structural deck and replacing with torch-applied SBS vapor barrier adhered Iso insulation adhered cover board and torch applied 2-ply SBS membrane roofing.In the plaza area we are removing existing landscaping to expose existing hot rubber waterproofing. Existing hot rubber waterproofing will be removed via shot blasting and new hot rubber and fluid-applied waterproofing will be installed. Soil and landscaping to be replaced under s
Comp to comp shingle replacement with no planned sheathing.
Tear off 1 layer of existing shingles down to plywood deck Inatall water shield in valleys and around all penetrations install underlayment on the remainder of the roof install Malarkey Highlander shingles
Replacing existing SBS/APP Torch-down roofing system with TPO 80mil Single-ply Roofing System.
Comp to comp shingle replacement with partial re-sheath.
Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Install Owens Corning Duration shingles.
Replacement of like for like composition roof material with plywood replacement.
Remove existing shingles. Replaced planned 4 sheets of 1/2" CDX. Install Owens Corning Duration shingles.
Removal of existing BUR to expose plywood deck for inspection and replacement of any deteriorated decking. Install new 2-ply SBS membrane roofing with adhered vapor barrier polyiso insulation and cover board. New roof will have 1/4:12 slope created with tapered insulation.
Shingle roof is getting replaced. The old shingles are getting removed deck will be inspected for any rot and new shingles will be put down. Only plywood decking with rot would be removed and replaced.
Remove roofing from building 3052/3056 down to existing sheathing install new 7/16" OSB over existing shiplap sheathing new Ice+water underlayment over entire roof surface new TPO gutters new flashings and vents and GAF Timberline HDZ "Hickory" shingles for finished roof product.
Comp to comp shingle replacement with no planned sheathing.
Comp to comp shingle replacement with no planned sheathing.