Search Permits
11,760 results · type: mechanical
ePlan: Residential Expedited Review - New Construction of 1-story Single Family Res. [4bed 4.5bath] with attached garage
ePlan: Commercial Expedited Review - New Construction of a 3-Story Multi-Family Bldg. also contains Leasing Mail Fitness and Social (60605 SF)
Replacement of complete existing central heat and air system with or without duct work 1 system: 2 Ton 16 Seer2 Two Stage Condenser evaporator coil and gas furnace
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (41282 SF)
Interior renovation and finish refresh of an existing tenant suite
Replacement of complete existing central heat and air system with or without duct work Hvac change out
Installing ductwork on a microwave exhaust and running it to an exterior wall vent.
1548BR NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND RERA PATIO
New construction of a 2 story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
ePlan: Commercial Expedited Review - New Construction of a 3-Story Multi-Family Bldg. (46515 SF)
Installation of 135-ft of 2-in PE gas line buried 18-in with 14-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION & USE OF HOIST AS PER DRAWINGS ATTACHED HEREWITH
TEMPORARY FENCE ENCLOSURE AT ROOF LEVEL DURING ROOF REPLACEMENT. FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.