Search Permits
1,190 results · type: roofing
Roof Deck Overlay with 60mil PVC.
Repair/replacement of existing roof membrane
Comp to comp shingle replacement with no planned sheathing.
Comp for comp shingle replacement with full re-sheath.
Comp for comp shingle replacement with full re-sheath.
Comp to comp shingle replacement with no planned sheathing.
Comp to comp shingle replacement with 4 planned sheets of plywood to be replaced.
Comp for comp shingle replacement with 4 planned sheets of plywood being replaced.
Comp for comp shingle replacement with no planned sheathing.
Comp to comp shingle replacement with full re-sheath.
Reroof approximately 1000 square feet existing roofing
Like for like replacement of TPO roofing on SFR. Some plywood to be replaced.
Torch down to PVC reroof with 11 planned sheets.
Comp for comp shingle replacement with 7 planned sheets.
Comp to comp shingle replacement with 3 planned sheets.
Comp for comp shingle replacement with full re-sheath.
Removal of existing roofing materials exposing plywood sheathing for inspection and or replacement if needed. Installation of (2) layers of 3.3" Poly-ISO Insulation to achieve the required R-Value of 38 along with HD Coverboard and 80mil Duro-Last Single-Ply PVC Membrane.
Tear off 1 layer torchdown roofing replace with TPO. Some plywood to be replaced.
Installation of the 60mil Duro-Last Single-Ply PVC Membrane with HD Poly-ISO Coverboard over the existing layer of torch down membrane. No revisions to structural or deduction to existing R-Value.
Removal and replacement of sloped roofing materials including but not limited to asphalt shingles roof underlayment roof flashings roof sheathing as needed miscellaneous roof accessories and vents as well as improvements to attic ventilation.
Removal and replacement of sloped roofing materials including but not limited to asphalt shingles roof underlayment roof flashings roof sheathing as needed miscellaneous roof accessories and vents as well as improvements to attic ventilation.
Removal and replacement of sloped roofing materials including but not limited to asphalt shingles roof underlayment roof flashings roof sheathing as needed miscellaneous roof accessories and vents as well as improvements to attic ventilation.
Removal and replacement of sloped roofing materials including but not limited to asphalt shingles roof underlayment roof flashings roof sheathing as needed miscellaneous roof accessories and vents as well as improvements to attic ventilation.
Remove existing torchdown. Replace all plywood with 1/2" CDX. Install .60 mil PVC roofing.
Residential reroof; no structural changes. Remove existing shingles. No planned plywood but will replace with 1/2" CDX if needed. Install new Owens Corning Duration shingles.
Re-cover PVC roof while adding a separation sheet and 60 mil PVC Membrane.
We are performing a PVC membrane overlay and shingle reroof on multiple roof areas including upper roofs and lower patios area decks.
Replacement of like for like PVC roof material. At this time no plywood is anticipated to be replaced.
Comp for comp shingle replacement with 78 planned sheets of plywood to be replaced.
Replacement of like for like composition roof material with plywood replacement.