Search Permits
11,760 results · type: mechanical
Interior (only) renovation of a 1980 built residential home in BeeCave Woods. Renovation includes modification upgrades to the original interior framing insulation electrical plumbing windows & HVAC using Energy Efficient construction methodologies and materials. No modification to the original existing square footage exterior periphery or building lot are being performed.
Replacing (3) Heat pump Roof Top Units with electric heat. (2) 6-ton and (1) 3-ton with electric heat.
Replacement of complete existing central heat and air system with or without duct work REMOVE AND INSTALL 10-TON LENNOX UNIT WITH CURB ADAPTOR
Replacement of complete existing central heat and air system with or without duct work Unit 414
Replacement of complete existing central heat and air system with or without duct work
Interior remodel - demolition construction of new ceilings finishes mechanical. electrical and plumbing as indicated on drawings. (Floor 3)
Interior remodel - demolition construction of new ceilings finishes mechanical. electrical and plumbing as indicated on drawings. (Floor 5 )
Express- Remove and replace drywall. Replace electrical receptacles. Replace plumbing fixtures. New HVAC. 3 damaged windows being replaced size for size. Insulation drywall bathrooms kitchen etc.
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation and use of temporary telehandler construction equipment as per plans filed herewith.
Installation of a temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
OFFICE RENOVATIONS 56C/57M WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF, AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
FILING FOR INSTALLATION OF 6 HVAC ROOFTOP UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF SEVEN CONDENSING UNITS ON THE ROOF WITH A TOTAL CAPACITY OF 21 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation and use of temporary knuckleboom construction equipment as per plans filed herewith.
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01295375-I1
Mechanical plans for new 2 family residential house.
INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING
REPLACEMENT OF EXISTING HVAC UNIT AT ROOF
Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 4th Floor as per plans (BNP Paribas Asset Management.) No change to use, egress or occupancy.
Modifications to existing HVAC system and related piping. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Propose installation of exhaust fan and associated duct work and piping. Relocation of piping and fan powered boxes. No change in use, egress or occupancy.