2,919 results · type: commercial
MISCELLANEOUS ELECTRICAL
Modification to existing system in main Kitchen
Exterior and Civil improvements for an existing, construction type II-B construction 16,000 SF B/S-1 occupancy building. Scope includes new driveway access, asphalt parking update, concrete sidewalks, masonry site walls, (2) awnings totaling 96 SF, (1) metal patio awing 133 SF, landscaping along East Falcon Dr, and East Road Runner Dr. The replacement or addition of signs on the site will require the review and approval of a separate permit. Special inspection for steel, soils, and post-install
REF - PMT24-16945 for original building plans. This permit includes replacing the planned structurally designed warehouse metal building with a Pre-Engineered Metal Building and various associated architectural and electrical changes. Type III-B. Additional SF (S-1 (56 SF) and A-3 (7 SF)) and occupant load (S-1 (1)) will be captured under this permit. Results in CofO.
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
CELLSITE
New one story ground up building to be used for a drive thru beverage service. Occupancy classification B, construction type VB. new accessible restroom, breakroom, prep/storage and service area. This permit includes site improvements. Deferred fire sprinklers, fire alarms, and CO2 system & detection. Special inspections required for steel, concrete, wood, masonry, wood, soils, anchor bolts, expansion, epoxy bolts. Deferred wood trusses. New 1" domestic water meter. New 3-phase electric meter.
Demo (5) existing RTU evaporative cooling units and install (5) new RTU heat pump units at existing building. New structural roof reinforcement, electrical connections, and air supply/return ducts and diffusers. Results in CofC.
New surfacing, sand, and wood fiber at an existing play area in a City of Mesa owned park. New ADA playground ramp. New lighting at existing shade structure. Results in CofC.
Replace existing make-up air units and new boiler. Special inspection for steel construction. Reviewed with comments. Results in CoC.
Demo existing pool and Spa and replace with new. No changes to pool and spa design. Existing pool equipment, pool barrier, and exits to remain. No changes to occupancy type or occupant load. Special inspections required: concrete construction. Results in CofC.
Addition and/or Alteration
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Upgrade of emergency water pumping and piping distribution system. Update of TES Heat Exchanger controls.
Revising support and restraints of existing 36" TES water piping at campus central plant. Scope included new concrete footings, structural supports, pipe restraints as well as a new isolation valve. Results in CoC.