Search Permits
2,736 results · type: residential
Addition and/or Alteration
Make Safe Permit For RP
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Make Safe Permit For RP
Addition and/or Alteration
RESIDENTIAL
RESIDENTIAL - FAU AND AC CHANGE OUT
WINDOW CHANGE OUTS
RESIDENTIAL
New 4-story, type V-A construction, 93,270 SF, Groups R-2 and S-1 occupancies, 88-unit multi-family building. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase II commercial building. Ref:
New 4-story, type V-A construction, 93,270 SF, Groups R-2 and S-1 occupancies, 88-unit multi-family building. Special inspections: steel, concrete, masonry, wood, anchors, fire-resistant penetrations & joints, and 1,000 amp electrical equipment. Deferred submittal: floor and roof trusses, steel stair, guardrails and handrails, fire sprinklers, fire alarms, and access control. Water meters: (1) 2-inch Domestic. Ref: PMT24-16677 for Phase I. Ref: PMT25-21729 for Phase II commercial building. Ref:
Fortified Roof Replacement *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Remove old shingles and felt down to bare decking. Replace any rotten decking. Install 8D ring shank nails through decking into rafters every 4”. Install OC Rhino ice and water shield over entire roof. Install 1 layer OC U20 synthetic felt over ice and water shield as a bond break. Install 26 gauge drip edge and OC roll starter on all rakes and eves. Install OC Duration Class 3 shingles over entire roof installing OC ProEdge shingles on all hips and ridges. Install new plumbing boots. Install ne
Complete re roof PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Residential reroof to the Fortified Standard *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Removal of existing roofing materials and installation of Ludowici Verea Span S.
Addition and/or Alteration
Make Safe Permit For RP
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Make Safe Permit For RP