Search Permits
11,623 results · type: electrical
temporary pole for new construction for cascades at oc Ref BP: 2026-029594
Rebuild Electrical Service Replace Sub-panel need scheduled shutdown with AE 200 amp main breaker 200 amp meter can grounding bonding
converting a gas furnace to Electric. Installing wiring to the new unit inside
INSTALL DEDICATED 60 AMP EV CIRCUIT FROM OUTDOOR MAIN BREAKER TO GARAGE; INSTALL CHARGEPOINT EV CHARGER WITH BUILT IN GFCI PROTECTION; INSTALL SURGE PROTECTION ON OUTDOOR MAIN BREAKER PANEL
Retroactively permitting above-ground pool.
Replace existing meter and panel with new 225 amp
QT - small interior remodel - selective demolition construction of new partitions ceilings mechanical electrical and plumbing as indicated on drawings at existing office space - OVA
Install reverse lit channel letters reading COMPASS on North elevation
Rack permit
New construction of 2 story sfr condo with 3 beds 2.5 baths and attached 2 car garage PUD
Install Level 2 EV Charger
Install new 8.925kW rooftop solar system and 11.5kW energy storage system for existing residential only
Archer - Install new _7.2__kW rooftop solar system to existing residential only using line side tap.
New portable and flatwork. 2026-067987 DA.
Request to Disconnect and Reconnect. TruTec will be upgrading existing panel and meter can to a 200 amp service.
PB- New construction SFR 4 bed 4.5 bath with attached garage and front covered porch/rear covered patio
200A Service Upgrade with EV Charger
Replace exterior main panel only (old FPE panel) and install new exterior main panel
60a Tesla wall connector installation
Replace PEC 200 amp main pedestal breaker
Express- Remove and replace siding replace windows like for like. Replace front door. REVISION 1: Add EP
We will be adding a Level 2 EV charger
HOME BUILDERS LOOP for New SFR COA BP: 2026-077816 Bluebonnet
Converting the main electrical service from overhead to underground using the new underground infrastructure and pull boxes that were installed by other as part of the secondary utility conversion for Austin Energy WO# 532861. Per EC meter work is being done (6/26/26)
MEP systems upgrade and expansion along with addition of server rack and associated equipment in an existing building. **Rev #1: LAB MEP Equipment Upgrade to include new canopy and foundation pad. -AP 5/26/26 **
Install of solar panels
Condominium renovation includes kitchen bathrooms and bedrooms for Unit 2007
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN STONEY CHASE ref. 2026-078339 BP
Install Level 2 EV Charger
Install a hardwired electric vehicle charger.