Interior tenant finish-out and change of use from F-1 to personal improvement services for a fitness facility (CrossFit Sanity). Work includes interior modifications installation of fitness flooring installation of a required fire barrier wall minor window replacement and installation of non-structural fitness equipment. Painting of interior walls and exterior wall.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger
New 3-story duplex; Unit A: 3-story 3 bedroom 4 bath with attached 1-car carport covered front porch and uncovered rear wood deck.
200amp panel 200amp meter grounding
200 amp panel 200amp meter base overhead riser replacement grounding
ePlan: Expedited Review - New Construction of 7 4-Story Multi-Family Bldg. (425647 SF).
Interior remodel of Single family residence: Expansion of kitchen and laundry room into existing garage removal of wall between living & dinning room. Replacement of exterior door & windows for same size. New gas & water lines for kitchen. Hvac work. Remodel of kitchen/living/dining.
Emergency upgrade of existing 200amp underground service with new panel and meter LIKE FOR LIKE
ETJ HOMEBUILDER LOOP for new SFR
homebuilder loop EP
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
INSTALLATION OF A 50 AMP DEDICATED CIRCUIT BREAKER FOR A HARDWIRED CHARGEPOINT HOME FLEX WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE SOLAREDGE HOME BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Installation of a new 14 kW residential standby generator with a 200A automatic transfer switch, new 118-gallon nominal 120-gallon aboveground ASME propane tank, associated LP-gas piping and regulators, and required electrical connections to serve the existing single-family residence. Reviewed as noted. Results in CoC. Minimum required inspection: gas underground, gas rough in, electrical rough in, and gas pipe final.
Relocation of electrical pedestal. Minimum required building inspections: Electric rough in and electric final.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
169-FT OF 1-IN ELECTRICAL RUN FOR PORTABLE SPA AND 113-FT OF .50-IN TO THREE PERGOLA CAN LIGHTS. ONE LIGHT SWITCH AND 60AMP GFCI OUTLET WITH TWO BUBBLE COVER. PERGOLA UNDER SEPARATE PERMIT PMT26-15875.ELECTRICAL TO BE INSTALLED PER 2023 NEC REQUIREMENTS
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF TWO TESLA POWERWALL 3. BATTERIES. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE
Installation of 22kw generator, sub panel, transfer switch, and dedicated gas line to existing SFR. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF TWO TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR