Search Permits
2,919 results · type: commercial
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
Addition and/or Alteration
New Construction
Commercial Make Safe Permit
Addition and/or Alteration
THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION FIELD OFFICE FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL **09/15/2024**. GENER
To provide temporary power to construction site. New temporary single phase electric meter.
THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION TRAILER FOR USE BY THE PROJECT MANAGER, PROJECT COORDINATOR AND LEAD BUILDERS. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL 4/9/2024. PERMIT INCLUDES GE
Add new sail shade and columns to extend to existing sail shade and columns. Special Inspections Required for soils and cast-in-place foundations. Results in CoC.
Install (2) gates and (2) 5-foot pole mounted signs at existing service ramp with guard rails. Results in CofC.
Group U occupancy. Type II-B construction. 324 SF. Occupant load 0. Install new 18-foot by 18-foot steel playground shade canopy with fabric cover at new apartment buildings. Special inspections required: concrete construction and steel construction. Results in CofC.
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
STORAGE RACKS
CIP - Relocate (3) existing pedestal electrical meters within approximately 10-feet of original locations due to work under Ellsworth Rd improvement project. 6805 S Ellsworth Rd, 6803 S Ellsworth Rd, and 5302 S Ellsworth Rd. Results in CofC.
Communication Tower Swap, like for like. Results in CoC.
AFP26-01140 This project consists of two new tool installations "Mazak" and "Kuraki" located within B531. The scope of work includes mechanical, compressed air, and electrical connections only.
Replacing 600A SES (4 electrical meter sockets) with like for like. (2) - 200A 3 phase electrical meters to be removed prior to work and replaced once work is completed. Existing electrical panels in suite G1 and G2 to remain. Results in CofC.
Place new concrete at base of existing loading dock to raise level. Demo stairs and bollards at loading dock and replace with new. Approved as noted. Results in CoC.
Install drone related equipment on rooftop of an existing building. Connect drone related equipment to existing electrical panel. New structural and electrical. Results in CofC.
New ground up 285,282 SF unlimited area data hall building with type II-B construction. Group B occupancy classification. Project includes the installation of mechanical and electrical yards. Foundation under PMT25-22348. Reference: PMT26-07321 for restroom code modifications, PMT26-07319 for fire access code modification and PMT26-07315 for fire sprinklers. Deferred fire sprinklers, fire alarm with emergency voice/alarm AND VESDA systems, cold form steel, pipe support systems, prefabricated bui
Remove and replace (3) 20ft high x 40ft wide Batters eyes at existing baseball fields. Replace existing batters eyes with 6 5/8-inch post and 9g chain link fabric. Special inspection required for steel and concrete. Results in CoC.
REPLACING A IMPROPERLY INSTALLED/MANIPULATED BACKFLOW DEVISE SER#2516275 FOR THE IRRIGATION.
Repair wood framed wall from car impact. This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of tra