Search Permits
217,836 results
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
SELF CERT: INTERIOR REMODEL OF AN EXISTING PLANET FITNESS; AS PER PLANS
INTERIOR RENOVATION OF COMMERCIAL LAB
SELF CERT 2019 CBRC INTERIOR AND EXTERIOR ALTERATIONS TO EXISTING VACANT BANK TENANT SPACE BASE BUILDING/LANDLORD WORK TO PREPARE SPACE FOR TENANT BUILDOUT INCLUDING REMOVAL OF NON-LOADBEARING PARTITIONS EXISTING FIXTURES AND FINISHES. INSTALL NEW INTERIOR DEMISING PARTITION AND NEW ENTRY DOOR. (2 STORY BUILDING CON TYPE 3A FS OCC B)
SELF-CERT 2019 CBC: REVISION TO PERMIT #101077826 FOR NEW MEETING ROOM/LOUNGE AREA, AND UPDATED POWER DISTRIBUTION THROUGHOUT SPACE, AS PER PLANS. (OCCUPANCY GROUP B; TYPE 1A CONSTRUCTION)
SELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO 13TH FLOOR OFFICE SPACE. WORK TO INCLUDE DEMO, NEW PARTITIONS, MECHANICAL, ELECTRICAL AND PLUMBING AS PER PLANS. 1A CONSTRUCTION. B-BUSINESS
SPR 2019 CBC: PROPOSED REAR 1 STORY FRAME ADDITION AND 2 STORY REAR FRAME ADDITION, INTERIOR REMODELING AND ALTERATIONS TO AN EXISTING 2 STORY FRAME SINGLE FAMILY RESIDENCE WITH BASEMENT AS PER PLANS.**CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS**
REPAIR EXISTING MASONRY WALL CONSTRUCTION DUE TO CAR HITING THE WALL AND DAMAGING THE MASONRY STRUCTURE
SELF-CERT 2019 CBRC: INTERIOR BUILD-OUT IN EXISTING BOW TRUSS AND STEEL 1 STORY BUILDING FOR PROPOSED SPORTS AND RECREATION PARTICIPANT INDOOR PHYSICAL FITNESS CENTER GYMNASIUM (WITHOUT SPECTATOR SEATING). EQUIPPED THROUGHOUT WITH SPRINKLER SYSTEM, PARKING, LOADING AND REFUSE ARE EXISTING BY LANDLORD. (III-B CONSTRUCTION TYPE, A-3 OCCUPANCY)
SPR 2019 CRBC: CHANGE OF OCCUPANCY AND INTERIOR RENOVATION FROM AUTO REPAIRS (S-1) TO FOR PERSONAL TRAINING BUSINESS (B) INCLUDING MEP SCOPE PER PLANS FOR THREE NEW BATHROOMS AND STAFF AREA. NO EXTERIOR WORK. NO STRUCTURAL WORK. (CONSTRUCTION TYPE III-B | OCCUPANCY B)