Search Permits
1,190 results · type: roofing
We will be removing the current composition shingles. We have no plans to replace sheeting at this time but if needed we will replace with new 1/2" cdx plywood. We will then install new composition shingles. Like for like replacement.
We will be removing the current composition shingles. We have no plans to replace sheeting at this time but if needed we will replace with new 1/2" cdx plywood. We will then install new composition shingles. Like for like replacement.
Replacement of torch down roof material with PVC roof material on carport only. 3 sheets of plywood to be replaced.
Replacement of like for like composition roof material on GARAGE only. Plywood to be installed as well.
Removal and replacement of existing BUR roofing with new PVC membrane and PMMA traffic coating.
Performing PVC single-ply roofing overlay on the existing BUR following manufacturer and code requirements for an adhered assembly using fleece-back membrane.
Remove existing built up roofing to concrete deck. Install new built up roofing.
We will be removing the current composition shingles. We will then plan to install new decking with new 1/2" cdx plywood over existing shiplap. We will then install new composition shingles. Like for like replacement.
We will be removing the current composition shingles. We will then plan to replace 53 sheets of the decking with new 1/2" cdx plywood. We will replace any sheeting if necessary. We will then install new composition shingles. Like for like replacement.
Re roofing a smaller South section of roof only. Not the entire building
We are going to tear off the existing shingles on the detached garage only. There plan to replace 4 sheets of plywood due to tree damage. We then install new composition shingles.
Reroof Overlay w/60 mil TPO Mechanically Attached
Tear off existing PVC roofing layer install ¼" EPS Custom Designed Taper System install 60 mil PVC roofing membrane
Comp for comp shingle replacement with no planned sheathing.
Comp for comp shingle replacement with 20 sheets of plywood to be replaced.
Replacement of torch down roof material with PVC roof material on main house only.
Comp for comp shingle replacement with no planned sheathing.
Recover existing torchdown roof with new PVC membrane.
Re roof. tear off and apply new shingles
Replacement of torch down roof material with PVC roof material. Some plywood to be replaced.
Roof Replacement: Remove And Replace Entire ExistingShingle Roof And Replace With New Shingle Roof
Like for like residential re-roof. Remove and dispose of existing roofing materials (composition roofing felt vents pipe flashings) down to a clean deck. Inspection of the roof deck for dry rot and fasten down any loose roof sheathing. Install all new Timberline HDZ Lifetime Shingle system and underlayment. Full re sheet included as well
Roofing replacement
Replacement of like for like composition roof material. 10 sheets of plywood to be replaced as well.
Comp to comp shingle replacement with no planned sheathing.
Comp for comp shingle replacement with 17 planned sheets of plywood to be replaced.
It's a full roof replacement. Roof is around 1724 sq ft.
Comp for comp shingle replacement with no planned sheathing.
Comp for comp shingle replacement with 34 sheets of plywood to be replaced.
Comp for comp shingle replacement with full re-sheath.