Search Permits
216,020 results
THE REPLACEMENT OF THE EXISTING ROOF MEMBRANE ASSEMBLIES WITH A NEW MULTI-PLY MODIFIED BITUMEN ROOFING MEMBRANE SYSTEM, NEW FLASHING, BRICKWORK, AND THE INSTALLATION OF NEW RAILINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Installation of 42.51 kw solar energy system on roof. No change of occupancy, use or egress.
Architectural work on parts of the cellar and 1st floor retail space as indicted on drawings. Minor work at rear mechanical courtyard.
Installation of 40.33 kw solar energy system on roof. No change of occupancy, use or egress.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INTERIOR RENOVATION OF APT K1407
Installation of 41.42 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 33.245 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 46.325 kw solar energy system on roof. No change of occupancy, use or egress.
MODIFICATION TO EXISTING SPRINKLER SYSTEM. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Modifications to plumbing systems as per plans filed herewith. No change to use, occupancy or egress.
Installation of 32.155 kw solar energy system on roof. No change of occupancy, use or egress.
HEREWITH FILING SOE PLANS OF PROP. 3 STORY ALT-1 BLDG. THE SOE INVOLVES 1:1 EXCAVATION ON EXPOSURE-3.
Installation of 48.505 kw solar energy system on roof. No change occupancy, use or egress.
Plumbing work on the 31st floor as indicated on drawings.
Installation of 46.87 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 45.78 kw solar energy system on roof. No change of occupancy, use or egress.
REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
8'-0 TEMPORARY CONSTRUCTION WOOD FENCE
Interior duplex apartment renovation involving non-loadbearing partitions and minor plumbing with related finishes, as per plans. No change in use, egress, occupancy or bulk.
Plumbing work on parts of cellar and 1st floor retail space as indicated on drawings.
Installation of 22.89 kw solar energy system on roof. No change of occupancy, use or egress.
INTEROR RENOVATION OF EXISTING APT 4 ON THE 4th FLOOR. DEMO AND CONSTRUCTION OF INTERIOR PARTITIONS, CABINETRY AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PLUMBING FILED UNDER SUBSEQUENT APPLICATION.
CMU repair at Stairs 1 and 2 at the cellar level and ground floor.
RENOVATE BATHROOM ON 2ND FLOOR AND INSTALL NEW POWDER ROOM ON 1ST FLOOR AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILE INTERIOR RENOVATION WORK AT EXISTING 3-STORY RESIDENTIAL BUILDING TO REMOVE PARTITIONS, INSTALL NEW PARTITIONS, DOORS, AND PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Change of Use
Change of Use
Change of Use
Change of Use