Search Permits
12,420 results · type: electrical
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Replace existing 400 AMP electrical panel, like-for-like replacement only.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical_permit_(r)
PERMIT IS ONLY FOR INSTALLATION OF ONE FRANKLIN WH AC-COUPLED BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR EMPORIA VEHICLE CHARGER LEVEL 2 HARDWIRE IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical