Search Permits
214,775 results
building
building
building
building
building
building
building
building
building
building
building
building
building
Detached ramada with kitchen covering 360 S.F. Utilities included for electrical and gas to fireplace and BBQ.
Install push piers at existing SFR. Special inspections required.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
TAYLOR MORRISON #3558 - New 2961 SF two story residence with 2+ car garage. Bonus room options. new meters.
NEW 2412 SF SINGLE STORY RESIDENCE WITH A 2+ CAR GARAGE FOR TAPESTRY AT DESTINATION. INCLUDES GAS, ELECTRIC AND WATER METERS. SPECIAL INSPECTION FOR POST TENSION SLABS. SEE MST23-00511 FOR STRUCTURAL CHANGES AND PATIO OPTIONS. ADDENDA MST23-01919 1.REVISED NEW STANDARD CONFIGURATION TO BE 8080 SDG: 2. REVISED TO ADD OPTIONAL 9080 MULTI SLIDE 3. REVISED TO ADD OPTIONAL 9080 MULTI POCKETING DOOR
New ADU detached – 996 S.F. livable. Single story. 2 bedroom, kitchen, 2 bath, laundry, and closet. Type V construction. R-5 occupancy. No gas. New 100 amp sub panel from existing 200 amp electrical main. No change to existing ¾ inch water meter. An ADU shall be served by the same water, sewer and electric utility providers and meters as the primary residence
Electrical only permit. Solar install is under 10,000 SF. Installation of a 41.82kW PV System with a Tesla PowerWall3, with (3) meters and batteries. Results in CoC.
Install 1 Cornell ESG10 Coiling Security Overhead Grille Door.
Installing two illuminated Multi tenant anchor/major tenant monument signs one along Elliot Rd and one along Power Rd at 58.96 sq ft each. Install one illuminated multi-tenant illuminated monument sign along Power Rd 58.96 sq ft. Install one illuminated project ID and tenant ID monument sign on the corner of Power Rd and Elliot Rd 41.24 sq ft. Engineering provided by Brett Sauers on 6/12/25. BOA24-00550
CONSTRUCT A 450 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. REF MST25-00925. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
746 S.F. detached garage addition to side yard of existing SFR. Truss calculations deferred. Utilities included.
CONSTRUCT A 448 SF SWIMMING POOL NO SPA/NO HEAT. ALL ELECTRICAL TO COMPLY WITH 2017 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #58912, EXPIRES 12/31/26. REF MST25-00925. ENGINEERING AND STRUCTURAL CALCS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. "THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2018 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS".
Add a new dedicated 20amp circuit with GFCI for washer appliance.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WOR
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A CHARGEPOINT HOME FLEX 48A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS. EFFECTIVE JANUARY 8, 2026, THE CITY OF MESA ADOPTED 2024 ICC AND 2023 NEC. AN APPROVED CODE MODIFICATION WAS ADDED TO THIS PERMIT ALLOWING CONTINUED COMPLIANCE WITH 2018 ICC AND 2017 NEC. STARTING APRIL 8, 2026, ALL NEW PE