Commercial Make Safe Permit
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
ADD & RELOCATE SPRINKLERS AT NEW REMODELED AREAS FOR NFPA 13 COMPLIANCE.
Provide a 52,500 sq. ft. tenant fit out in an existing structure to include 5 offices, open office area, conference, breakroom, restrooms and count room.
New surfacing, sand, and wood fiber at an existing play area in a City of Mesa owned park. New ADA playground ramp, ADA picnic table, and ADA BBQ grill. New future shade structures and playground equipment to be installed under a separate permit. New electrical provided for future shade structure lighting. New light pole. Results in CofC.
High pile combustible storage and racking, for new 148,902 SF retail store, construction type II-B. Building Permit PMT24-22071. Special inspection required for post-installed anchoring. Reviewed as Noted: Field to verify the required exit on the east side of the storage area remains in place as approved under PMT24-22071. The required means of egress shall remain unobstructed and accessible throughout construction and upon completion of the work. Results in CoC.
1. This permit is for a code study to allow for staged evacuation of the Mesa Arts Theater Complex. 2. Evacuation zones have been identified by existing fire barriers, wall ratings, and exit passageways. 3. Sequence of operations has been provided to show which zones will be notified at the same time. 4. This code study is for the building formerly known as d, e, & f as shown on original site map shown on this page. Fire alarm replacement plans are submitted under PMT25-21608.
CONVERSION OF GARAGE TO SALES OFFICE FOR MODEL COMPLEX. REF MODEL COMPLEX PMT21-03456. STIP: THIS HOME IS NOT TO BE INHABITED UNTIL THE SALES OFFICE IS CONVERTED BACK TO A GARAGE.THE PARKING LOTS 195 (10857 E TAHOE AVE), LOT 196 (10863 E TAHOE AVE) HAVE BEEN CONVERTED BACK AND THE PARKING LOT IS NO LONGER NEEDED. GARAGE AREAS MODIFIED OR IMPROVED FOR THE PURPOSE OF PROVIDING A TEMPORARY OFFICE SHALL BE RESTORED BACK TO A GARAGE PER PARKING STANDARDS IN CHAPTER 32 OF ZONING ORDINANCE PRIOR TO T
Adding exterior lifts and minor equipment under existing canopy. Scope includes 250 gals UL 142 oil tank. No change to use or square footage. No work to the interior. Special inspection of post-installed anchoring. Reviewed as noted. Results in CoC.
AFP26-01281 Replacement of 10 automatic transfer switches with 13 automatic transfer switches.
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
AFPS SHALL ADD/RELOCATE A TOTAL OF 18 SPRINKLER HEADS IN THE RENOVATED SPACE IN ORDER TO PROVIDE ADEQUATE COVERAGE PER NFPA 13, 2022.
Install fire sprinkler system in Phase 3
ELECTRICAL COMMERCIAL
MISCELLANEOUS ELECTRICAL
MISCELLANEOUS ELECTRICAL
MISCELLANEOUS ELECTRICAL
Install a 100A single phase electrical meter, electrical panel, and receptacle for temporary power at construction site for a new hotel (PMT25-14213). Results in CoC.
Installation of CO2 monitoring system. This is a plug and play low voltage system. We plug our 24V 2amp plug into an existing 110V outlet no more than 12” from the ground which will connect to the monitor and will activate both audible and visible alarms upon a CO2 leak. There are no modifications structurally or electrically.
A new ground-up Dutch Bros Coffee building, with a drive-thru, patio area and site development. Please refer to permits PMT23-06965 and PMT23-06747 for site improvement done by the developer. Developer civil drawings are attached for reference. Occupancy classification B, construction type VB. New accessible restrooms, manager’s office, service area, prep area and walk in cooler. New site improvements. New 1,720 fabric shade canopy. New 1” domestic water meter. New 3-phase electric meter. New 3/
Buildout of the Val Vista Drive and Southern Avenue intersection that will improve safety, increase capacity, and reduce congestion that occurs at the intersection during peak travel hours. This Project is included in the MAG Regional Transportation Plan (RTP) that will receive Regional Area Funds for design, land acquisition, and construction. This Project will improve Val Vista Drive to accommodate 3 through lanes in each direction from the US 60 to Enid Avenue. Dual left turn lanes (with ra