Search Permits
213,964 results
Express: Master and secondary bathroom remodel (drywall work insulation work shower work electrical work exhaust fan bathtub work replace hot and cold water lines replace copper pipes with pex) not relocating fixtures replace siding
MAVIS SIGN B
Add a second dwelling unit to an existing single-family lot with updated address 11739 D-K Ranch Rd. Building 2 See address validation letter from Addressing Services.
New residential Swimming Pool & uncovered walkway/deck under 200sqft. Pool equipment will be located at pool behind waterfall to keep all pool plumbing and pool pipes to stay away from protected (and other) trees.. Trench for water electric gas will run from back-right of existing home to pool equipment. This is the only (small) trench needed by trees due to locating pool equipment at pool itself.
Express: Tub to shower conversion in master replace walls in shower
New detached garage 6/29/26 SM - REVISED ** Detached garage is at the back of the property and will have an attached accessory habitable space.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas Bldg 3 (103235 SF). 3000amp 277/480v CT service metered at transformer.
Replace sewer yard line from house connection to City tap.
Construct new driveway approach of 16 FT and curb & gutter of 8 FT. Fee in lieu of sidewalk paid.
Replacement of complete existing central heat and air system with or without duct work kirk
EXPRESS: Replace siding around entire exterior and behind electrical boxes.
Installing 133.65 KW Solar System with 243 ALEX 550 W panels and 2 SCA60KTL Do us 480 inverters
ePlan: Commercial Expedited Review - [APPROVED] New Construction of 3-Story Worship Learning Center to Include Outdoor Playground [ 10472 SF] **Landscape Inspection required**
Tunneling to realign the pipeline for master bathroom. We will be digging 38 feet and the access hole is on the right side of the house.
Replace approximately 100 of building sewer line in yard. Take out old cast iron and replace with schedule 40 PVC.
Interior Remodel/Garage conversion - Remodel master bath and move utility room to garage
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: Remove and replace existing 2-ton split system (outdoor condensing unit and gas furnace) No structural change.
temporary t pole
ePlan: Expedited Review - New Construction of a Warehouse Shell (14688 SF) *NOT FOR OCCUPANCY* Unit 101- 120/208v 800amp CT service.
New construction of 3 story sfr with attached garage and balcony
New construction of sfr with 3 beds 2 baths 2 car garage alley access PUD
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 3 New construction of a 2-Story Single Family Res. [3bed 3.5bath] with basement Attached Garage
TEMP POWER
Change of Use from Retail to Financial Services with Renovation 2026-018687 DA - Pending
Replacement of an existing water heater Replace 50-Gallon Gas Water Heater Location: garage
Replacement of an existing water heater 40gal gas tank located in the attic
Moscoso S423 B Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Requesting Permit to do a Panel Upgrade from150 to 200 amps will install a new meter can and new 200 amp panel
Construct new driveway approach of 30 FT. No sidewalk inspection per plan review. SP-2025-0031C.SH.P1 2026 054621 000 00 SSI