Search Permits
213,342 results
comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom.
installation of a new 75 kva transformers and 200 amp panel on existing infrasture. intallation of 3 new charge point. ev chargers.
to obtain final inspection for work approved under pa# 201510270960. all work is complete.
waterproof 6ft of foundation.
remove (e), rear yard tent structure that was constructed under p/a 2012-0917-9958 (that covers a dining table permitted under 2011-0513-6025) with a 14¿x20¿x10¿ tall, aluminum-framed pergolas supported by 5 aluminum tube footings on an isolated concrete pad foundation system.
deferred electrical plans for pa #202604179653
revision to permit 202211086122-s1. remove concrete spiral stairs at rear from scope of work. garage post to remain.
re-roofing, asphalt shingle. install 1/2" cdx plywood over existing sub-roof. nail with 10d at 6" perimieter nailing and 12" field nailing.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
rev 202508284097: basement - excavate area in order to accommodate a garage space. 1/f: new wood staircase to new basement. all work not visible to row.
re-roofing with hotwork
re-roofing with hotwork
4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5.
to comply with nov# 202431573. add 2 bedrooms & 1 bathroom on the ground floor,remove the 1-story wet bar addition at the northwest,relocate (shift) existing 2-story deck with stairs to be 3 feet away from property line
units 2k, 7h, 4a: kitchen and bathroom remodels for all 3 units. no changes to layout or walls.
exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.
rear cottage (detached garage): in kind overhead door replacement, voluntary strengthening by bracing of openings and in kind repair of masonry at garage only.
6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space.
to comply with physical inspection report cc 8735.
revision to 202604239938, new framing of bathroom floor and walls
reroofing: remove the (e) shingles and install new fiber glas shingles. not hot works.
reroofing: remove (e) shingles and install new fiberglass shingles. no hot works.
unit 318- kitchen and bathroom remodel to include (n) skylights, window replacement in kind not visible from street.
unit 214: bathroom remodel, new shower pan, shower to shower, new faucet, tiles, vanity, toilet, fan, lights.
replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor.
level b2 only: revision to 201907267098 s2. change const type from approved type vb to type 1a at sub-basement b2 only: change from nfpa-13r to nfpa 13 at sub-basmnt level b2 only. modify (e) pandeck flr/ceiling assemply at lvl b2 to provide 3 hr rated floor/ceiling assembly
reroofing: remove old roof & install new modified bitumen. no hot work.
reroofing: reroof tear off & replace all shingles. no hot works.
reroofing complete roof. no hot works.
minor interior remodel including renovation of bathroom to add 2nd full bath. addition and removal of partition walls, addition of washer dryer. addition of new window at lightwell, update lighting and electrical.