Search Permits
212,854 results
Renovation of an existing commercial store U.G. 6 at the 1st floor. No change in use, egress or occupancy under this application.
Installation of 44.145 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.56 KW
HEREWITH FILING FOR SILL & STUCCO REPAIR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
APPLICATION IS FILED FOR THE DEVELOPEMENT OF 3-STORY, 2-FAMILY ATTACHED RESIDENTIAL BUILDING. BUILDING LOCATED ON (1) OF SIX TAX LOTS ON (1) ZONING. ALL WOK AS PER PLANS SUBMITTED HEREWITH.
INTERIOR RENOVATION OF THE 1ST AND 8TH FLOORS. PARTITION CHANGES TO NON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INTERIOR MINOR RENOVATION OF EXISTING RESTAURANT IN PARTIAL 1st FLOOR WITH PLUMBING WORK: INSTALL NEW PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
MECHANICAL: ADDITIONS/MODIFICATIONS TO INTERIOR HVAC SYSTEMS WITH INDOOR CONDENSERS IN APARTMENT 4AB AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY..
Plumbing work for Cafe space as shown on plans filed herewith. No change to use, egress or occupancy.
Filing Sprinkler application subsequent to primary job number B01289522-I1.
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILING HEREWITH FOR FACADE RESTORATION . THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE
STRUCTURAL WORK RELATED TO THE INTERIOR RENOVATION TO EXISTING 2 FAMILY DWELLING, ALTERATION 1 (ALT-CO) TO CONVERT 2 FAMILY TO 1 FAMILY DWELLING.
LEGALIZE WORK AT CELLAR WITH REAR YARD EXIST AS SHOWN
PLUMBING WORK @ CELLAR AND 1ST FLOOR COMMERCIAL SPACE OF EXISTING BUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
ALTERATION APPLICATION FILED HEREWITH FOR NEW PLUMBING FIXTURES AND ASSOCIATEDPIPING FOR WHITE DEMISED COMMUNITY FACILITY SPACES. NO CHANGE IN EGRESS, USE, OROCCUPANCY UNDER THIS APPLICATION
JOB FILED FOR MINOR RENOVATION IN APT11R. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Reconfiguration of partitions on 2nd & 3rd floors. No change to use egress or occupancy.
DEMOLITION OF STOREFRONT AND INTERIORS AT FIRST FLOOR AND CELLAR COMMERCIAL SPACES OF NON-STRUCTURAL ITEMS. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of three (3) new air conditioning units and associated piping and ductwork. No change in occupancy or egress.
Mechanical work on parts of the cellar and 1st floor retail space as indicated on drawings. Minor work at rear mechanical courtyard above 1st floor.
FILED THIS APPLICATION TO RESOLVE THE ECB VIOLATION # 34259745Z. PLUMBING WORK INVOLVED ONLY @ CELLAR FLOOR. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD FOR PS 111X AT 3740 BAYCHESTER AVENUE, BRONX IN CONJUNCTION WITH ALT# X01218132 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INTERIOR RENOVATION OF APARTMENT 8B ON THE 008 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
INTERIOR RENOVATION OF APARTMENT 8B ON THE 008 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Installation ofo 46.87 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 33.245 kw solar energy system on roof. No change of occupancy, use or egress.
Replacement of existing kitchen and bathroom plumbing fixtures. Removal of existing powder room plumbing fixtures.
REMOVE COMMERCIAL KITCHEN GAS EQUIPMENT AND PLUMBING FIXTURES AT 1ST AND CELLAR. REMOVE NON BEARING INTERIOR PARTITION WALL AND PATCH AND REPAIR THE INTERIOR PARTITION WALL AS PLAN.