Search Permits
12,156 results · type: mechanical
ePlan: Commercial Expedited Review - Interior Remodel of Floor 13 (36112 SF)
Replacement of complete existing central heat and air system with or without duct work Change-out 3-ton 2-stage gas system.
Replacement of complete existing central heat and air system with or without duct work
Replace existing 5 ton package unit with new 5 ton package unit replace curb adapter. Gas heat.
Replacement of complete existing central heat and air system with or without duct work 14736 Olive Hill Drive
Replacement of complete existing central heat and air system with or without duct work
New construction of SFR Condo with 3 beds 2.5 baths and attached 2 car garage PUD
ePlan: Commercial Expedited Review - Interior Remodel of Floor 1 (9020 SF).
ePlan: Commercial Expedited Review - Interior Remodel of Floor 14 (35185 SF).
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Installing a 2 ton gas system
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 TON HORIZONTAL GAS System
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Express: Kitchen remodel replacing cabinetry fixtures flooring and updates to lighting. No walls to be removed and plumbing to remain in same locations
Replacement of complete existing central heat and air system with or without duct work Urban
Replacement of complete existing central heat and air system with or without duct work
BLDG #2 New 2-Story dwelling unit 2 Bed/2 Bath with attached carports covered patio and balcony new alley driveway (Two Unit Use)
Project consists of an existing classroom of approximately 920 sf to be converted into a Mental Health Center with an office.
First time finish out to create a gym for children 3-12 years. (Bldg. 1)
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Hughes 841-N-R Is a New one-story single family residence with (4) bedrooms (3) bathrooms an attached two-car garage and a covered entry porch and patio.
***Timed Virtual Inspection: 06/01/2026 @ 9 AM*** Replacement of complete existing central heat and air system with or without duct work
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - AC CONDENSER CHANGE OUT
To install a 5 ton and 3 ton a/c and heat systems.the 5 ton air handler with 20 kw heat and a 3 ton air handler with 10 kw heat will be installed in ceiling.the 5 ton and 3 ton condensers will be installed on roof.also install supply and return ductwork,refrigeration line set.
2 3ton , gas central A/Csystem
Installation of a 4-ton inverter system 21 SEER with a gas furnace, Installation of a 2.5-ton 15 SEER system with a gas furnace, Venting bathroom, dryer, and hood