Search Permits
1,190 results · type: roofing
Roof REPLACEMENT + WARM ROOF CONVERSION Solution:- Installation of Vapor Barrier on the entire roof deck. Installation of Vapor Barrier on the entire roof deck. -Installation of 6.6" Polyisocyanurate (PolyISO) insulation across the entire roof area-Installation of two layers of Fire Retardant (FR-10)-Installation of DURO-LAST 60mil PVC (GREY) Roofing System over the entire roof area (MECHANICALLY ATTACHED).
Residential reroof only; no structural changes. Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Install new Owens Corning Duration shingles.
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 7 sheets 1/2" CDX. Install new Owens Corning Duration shingles.
Residential reroof only; no structural changes. Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Install new Owens Corning Duration shingles.
Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Installed new OC Duration shingles.
Remove existing shingles. No planned plywood but if plywood is needed will replace with 1/2" CDX. Install Owens Corning Duration shingles. On flat roof of main house remove existing torchdown and install 60 mil PVC.
Remove existing shingles replace planned 56 sheets 1/2 inch CDX and install new Owens Corning Duration shingles.
Re-roof of a multifamily home. Roof is composition shingles being removed and new composition shingles being installed. There is plywood already on the structures roof deck.
Residential reroof only; no structural changes. Remove existing shingles. No planned plywood but if any plywood is needed we would replace with 1/2" CDX. Install new Owens Corning Oakridge shingles.
Remove existing architectural shingle and install new architectural shingle on existing multi-family residential 6 unit condominium - 2 842 sq ft roof area.
Remove existing shingles. Install all new 1/2" CDX for decking. Install new Owens Corning Duration shingles.
Remove existing shingles. Replace planned 3 sheets 1/2" CDX. Install new Owens Corning Duration shingles.
Like for like replacement of composition roofing on house only. Plywood to be replaced.
Erie to remove existing roofing and properly dispose. Erie to furnish and installice and water shield where applicable.Erie to furnish and install fiberglass dimensional shingle.Erie to furnish and install all accessories that may include drip edge pipe boots and flashing.Erie to vent roof properly.Erie to furnish and install Premium Synthetic Underlayment.Erie to inspect the decking to ensure a suitable base for installation of EPDMsystem.Erie to prep existing roof to receive the Eri
We are installing a Metal roof on a newly built home.
King County Wastewater Treatment Division proposes to replace the existing low-slope roof membrane and sheet metal flashings as the current roof has reached the end of its useful life.
Remove and replace existing green roof and roof related sheet metalflashings and trim at an unstaffed equipment shelter. There will be no ground disturbance or increase of development footprint.
Residential reroof; no structural changes. Remove existing shingles. Replace planned 3 sheets 1/2" CDX. Install new Owens Corning Duration shingles.
King County Wastewater Treatment Division proposes to replace the roof of the existing East Pine Street Pump Station Facility located within King County Parcel 4114600995 at 1502 Lake Washington Blvd Seattle WA 98122. The new roof will be constructed as a like and in-kind replacement in relation to the current roof design. This project is necessary as the existing roof system has reached the end of its useful life. The footprint of the existing building will not be changed nor will any other
Roof Replacement
Reroofing 550 sq ft of damaged TPO
Work done to house only tear off 3 layers (combo of comp and shake) replace with composition roofing. OSB to be replaced on entire roof.
Remove existing roofing material Inspect the roof deck for any damage or deterioration. If necessary replace any compromised plywood.Install 1/2-inch fanfold insulation ensuring proper alignment. Secure the insulation using the appropriate fasteners. Install new TPO membrane ensuring all seams are properly welded or heat-sealed. Install box vents as required and ensure proper sealing. Install clad metal flashing as needed securing it with the correct fasteners and sealing it t
Like for like replacement of composition roofing on SFR house only. Plywood to be replaced.
Like kind residential re-roof - Tear off 1 layer PVC roofing material replace sheathing install new PVC roofing system
Residential reroof only; no structural change. Remove existing shingles. Replace planned 6 sheets of 1/2" CDX. Install new Owens Corning Duration shingles.
Residential reroof; no structural changes. Remove existing shingles. No planned plywood but if plywood is needed we will replace with 1/2" CDX. Install new Owens Corning Duration shingles.
Residential reroof; no structural changes. Remove existing shingles. Replace planned 11 sheets 1/2" CDX. Install new Owens Corning Duration shingles.
Residential reroof; no structural changes. Remove existing shingles. No planned plywood but if any is needed we would replace with 1/2" CDX. Install Owens Corning Duration shingles.
reroof