Search Permits
11,760 results · type: mechanical
INSTALLATION OF TEMPORARY PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
Mechanical work on the 7th and 12th floor as indicated on drawings.
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Proposed temporary installation of contractor sheds/ shanties at 1st & 2nd floor as per BC 3303.16 to be used as temporary offices during construction of New Building filed under 421405642. No change in use, egress and/or occupancy with this application.
1225 MORRIS PARK AVE - VAN ETTEN 1ST FLOOR MAKE READY RENO - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF MECHANICAL EQUIPMENT AND PIPING AS PER PLANS
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
REPLACE ONE CONDENSER UNIT OF LIKE KIND ON 1ST STORY NORTH SIE ROOF SET BACK EXISTING PIPING AND DUCTWORK. REPLACE ONE AIR HANDKLERS UNIT OF LIKE KIND INSIDE GNC STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL SYSTEMS ALTERATIONS IN EXISTING BLDG - REPLACEMENT OF SPLIT SYSTEMS SERVING EXISTING OFFICE SPACES.
APPLICATION IS FILED FOR THE HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING 2-STORY ONE FAMILY RESIDENCE AND INTERIOR RENOVATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NEW C/O TO BE ISSUED.
Mechanical work filed in conjunction with the renovation of an existing two family dwelling. Mechanical work as per plans. No change of use, occupancy or egress.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING FOR 5 TON SPLIT AC UNIT FOR WELCOME CENTER AT 250 FIRST AVE. OBTAIN CERTIFICAGTE OF COMPLIANCE. MECHANICAL WORKTYPE FILED AND SIGNED OFF UNDER 122263460.
New Mechanical system heat pump AC unit equipment with related piping and ductwork as shown on drawings.
MECHANICAL WORK ASSOCIATED TO THE APARTMENT RENOVATION ON THE FIFTH FLOOR TO APARTMENT UNIT 5B. NEW DUCT INSTALLATION, AND MECHANICAL UNIT INSTALL. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Modification of existing HVAC systems on 33 & 34th fls interior demolition, relocation and installation of fan-powered boxes, exhaust fan, ductwork distribution and associated piping as per plans. No change in use, egress or occupancy. Ducera
INSTALL NEW AC UNIT IN THE ELEVATOR MACHINE ROOM
FILING TO PROTECT NEIGHBOR DURING CONSTRUCTION OF NEW BUILDING. THIS SYSTEM IS A SITE SPECIFIC ENGINEERED ENCLOSURE SYSTEM SUBJECT TO THE REQUIREMENTS OF BC 3309.17. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Mechanical work filed in conjunction with the renovation of residence. New HVAC.
NEW VAV BALANCING AND CONTROLS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
***Timed Virtual Inspection: 09/17/2026 @ 10 AM*** Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New Construction of a 2-Story Single Family Res [4bed 5bath] with Attached Garage. *Repair curb and gutter with new drive permit