Search Permits
212,046 results
Upstairs hall bathroom tub-to-shower conversion with 60x32 low-profile Preformed shower base, no drain relocation, no structural changes.
Modify existing fire alarm system by installing a new of addressable fire alarm system featuring smoke detector above panel, sprinkler and duct detector monitoring, elevator recall, pull stations at each exit, and notification devices. Approved with comments.
Converting tub to shower, replacing pan, drain, and valves.
T-RISK GRADING PERMIT TO BEGIN SITE GRADING PRIOR TO BUILDING PERMIT APPROVAL. THIS PERMIT IS FOR GRADING ONLY AND DOES NOT INCLUDE ANY UTILITY OR OTHER WORK. REFERENCE RECORD ID: PMT25-16733.
This report identifies permits and documentation required to obtain a permit for removal or restoration of the building to a safe condition. This report is not an appraisal for financial claims. The building inspector may require portions of the building or other debris to be removed to allow evaluation of the damage. Structural shoring and additional lighting may also be required. Before demolition or restoration can begin, an approved method of trash containment and removal must be in plac
Install one non-illuminated aluminum lettersets flush mounted to building GUIDANT LAW FIRM 55 sq. ft.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
Demo existing park model and construct a new 944 sq ft custom home on a raised floor. Construct a new 259 sq ft deck and 11 sq ft shed. All construction to comply with 2024 IRC and 2023 NEC. Minimum one 9-ft x 18-ft paved, 2-in asphalt or 4-in concrete, unobstructed parking space required. Parking may encroach into front setback. Minimum setbacks 4-ft front approved under BOA25-00403, 5-ft rear, 0-ft pm side and 3-ft awning side. Approved as noted.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building
building