Search Permits
211,757 results
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF ENERGY RECOVERY VENTILATOR WITH DUCTWORK AND AIR CONDITIONING SYSTEM.
RESTORE CELLAR TO PREVIOUS LEGAL CONDITION AS PER THE PLANS FILED HEREWITH TO REMEDY ECB VIOLATION #39125134H. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
NEW, REPLACED, AND RELOCATED FIXTURES, PIPING, PLUMBING EQUIPMENT WILL BE INSTALLED AND CONNECTED BACK INTO THE EXISTING TO REMAIN WATER SUPPLY AND WASTE SYSTEM. NO CHANGE TO OCCUPANCY. USE OR EGRESS.
General construction for interior renovation of Apartment 0MA on the 1st floor as shown on drawings filed herewith. No change in use, egress or occupancy.
INSTALL NEW CONSTRUCTION WOOD FENCE AT OPEN SPACE.
INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 7 MODULES, 3.045KW
General construction for interior renovation of Apartment 1A on the 2nd floor as shown on drawings filed herewith. No change in use, egress or occupancy.
BK EASTERN PARKWAY LIB - SOE SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# 321590738, NO CHANGE IN USE, OCCUPANCY OR EGRESS
Filing to repair and replace interior stairs at the same location and to repair the roof. This filing will be no change in use, egress, or occupancy.
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 2-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB Q01372532-I1 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
NEW HIGH PRESSURE GAS SERVICE. METER & REDUCING STATION, NEW LOW PRESSURE GAS LINE. NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRES USE GROUP OR OCCUPANCY.
Modification to the existing Plumbing fixtures and piping, as per the approved drawings, for conversion to a school.
Foundation work in conjunction to the ALT-CO application #B01316543-I1
LIMESTONE REPAIR AND REPLACEMENTS, BRICK REPAIRS, WINDOW REPAIRS, SHEET METAL REPAIRS, WINDOW SILL REPLACEMENTS
1.CORRIDOR RENOVATION (3RD TO 6TH FLOORS ONLY) DUE TO ELECTRICAL REPAIR WORK. FLOOR FRAMING REPAIR AT PUBLIC BATHROOMS (3RD TO 6TH FLOORS ONLY)
INSTALL (1) NEW DIRECT VENT GAS FIRED HOT WATER BOILER WITH INTEGRAL BURNER FOR APT 2B. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
NEW TEMPORARY, NON-LOAD BEARING PRESSURIZED PARTITION WALL. NO CHANGE IN USE OR OCCUPANCY
INTERIOR RENOVAITION ON 25TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
General construction for interior renovation of Apartment 9H on the 10th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.
PROPOSED METAL CORNICE REMOVAL AND FACADE RESTORATION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED METAL CORNICE REMOVAL AND FACADE RESTORATION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ALTCO TO CONVERT OFFICE AND SHOWROOM FROM USE GROUP 6 TO YESHIVA UNIVERSITY KATZ SCHOOL OF MEDICINE AND HEALTH IN USE GROUP III(B) AS PER THE PLANS FILED HEREWITH. EGRESS ANC CHANGE OF USE UNDER THIS APPLICATION. ALL WORK PERFORMED UNDER APP#M01257148.
INTERIOR RENOVATIONS OF EXISTING COMMERCIAL OFFICE SPACE WORK TO INCLUDE NEW NON-STRUCTURAL PARTITION WORK, DOORS AND ASSOCIATED FINISHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
PROPOSED OF WINDOW LINTELS, POINTING AND CRACK REPAIRS TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
New plumbing for commercial kitchen on first floor, Kitchen hood to be provided with FDNY-approved fire suppression system under separate permit. New plumbing for bathroom on first floor. New plumbing for cellar floor bathroom and drainage.
TO ERECT TWO STORY ADDITIONS AT FRONT & REAR AND RAISE ATTIC INTO A 2ND FLOOR IN THIS EXISTING 1.5 STORY 1 FAMILY DWELLING AND TO ADD AN ADU. WORK TO INCLUDE THE REMOVAL & INSTALLATION OF STRUCTURAL MEMBERS, PARTITIONS, FENESTRATION & MECHANICAL EQUIPMENT
Plumbing work as shown on plans. No change in use, egress or occupancy.
PLUMBING WORK ON THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of HVAC Equipment as per plans filed herewith.