PermitDig

Search Permits

211,757 results

Installation of solar system on the roof as per plan. No change in use, egress or occupancy

734 CHURCH ROAD, Queens
29KJun 3

INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF ENERGY RECOVERY VENTILATOR WITH DUCTWORK AND AIR CONDITIONING SYSTEM.

210-15 NORTHERN BOULEVARD, Queens
167KJun 3

RESTORE CELLAR TO PREVIOUS LEGAL CONDITION AS PER THE PLANS FILED HEREWITH TO REMEDY ECB VIOLATION #39125134H. NO CHANGE IN USE, OCCUPANCY OR EGRESS.

58-08 VAN HORN STREET, Queens
29KJun 3

NEW, REPLACED, AND RELOCATED FIXTURES, PIPING, PLUMBING EQUIPMENT WILL BE INSTALLED AND CONNECTED BACK INTO THE EXISTING TO REMAIN WATER SUPPLY AND WASTE SYSTEM. NO CHANGE TO OCCUPANCY. USE OR EGRESS.

162 CLINTON STREET, Brooklyn
32KJun 3

General construction for interior renovation of Apartment 0MA on the 1st floor as shown on drawings filed herewith. No change in use, egress or occupancy.

300 FIRST AVENUE, Manhattan
17KJun 3

INSTALL NEW CONSTRUCTION WOOD FENCE AT OPEN SPACE.

821 54 STREET, Brooklyn
20KJun 3

INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 7 MODULES, 3.045KW

1179 REMSEN AVENUE, Brooklyn
15KJun 3

General construction for interior renovation of Apartment 1A on the 2nd floor as shown on drawings filed herewith. No change in use, egress or occupancy.

605 EAST 14 STREET, Manhattan
17KJun 3

BK EASTERN PARKWAY LIB - SOE SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# 321590738, NO CHANGE IN USE, OCCUPANCY OR EGRESS

1044 EASTERN PARKWAY, Brooklyn
350KJun 3

Filing to repair and replace interior stairs at the same location and to repair the roof. This filing will be no change in use, egress, or occupancy.

725 DUMONT AVENUE, Brooklyn
60KJun 3

TO PROPOSE PLUMBING & GAS WORK AT EXISTING 2-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB Q01372532-I1 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.

86-34 GRAND AVENUE, Queens
84KJun 3

NEW HIGH PRESSURE GAS SERVICE. METER & REDUCING STATION, NEW LOW PRESSURE GAS LINE. NEW GAS TRAINS. NO CHANGE IN MEANS OF EGRES USE GROUP OR OCCUPANCY.

315 CENTRAL PARK WEST, Manhattan
100KJun 3

Modification to the existing Plumbing fixtures and piping, as per the approved drawings, for conversion to a school.

133-50 41 AVENUE, Queens
40KJun 3

Foundation work in conjunction to the ALT-CO application #B01316543-I1

67 SOUTH 6 STREET, Brooklyn
10KJun 3

LIMESTONE REPAIR AND REPLACEMENTS, BRICK REPAIRS, WINDOW REPAIRS, SHEET METAL REPAIRS, WINDOW SILL REPLACEMENTS

501 WEST 114 STREET, Manhattan
500KJun 3

1.CORRIDOR RENOVATION (3RD TO 6TH FLOORS ONLY) DUE TO ELECTRICAL REPAIR WORK. FLOOR FRAMING REPAIR AT PUBLIC BATHROOMS (3RD TO 6TH FLOORS ONLY)

312 WEST 93 STREET, Manhattan
132KJun 3

INSTALL (1) NEW DIRECT VENT GAS FIRED HOT WATER BOILER WITH INTEGRAL BURNER FOR APT 2B. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.

47 CLIFTON PLACE, Brooklyn
27KJun 3

NEW TEMPORARY, NON-LOAD BEARING PRESSURIZED PARTITION WALL. NO CHANGE IN USE OR OCCUPANCY

308 EAST 72 STREET, Manhattan
5KJun 3

INTERIOR RENOVAITION ON 25TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

375 PARK AVENUE, Manhattan
51KJun 3

General construction for interior renovation of Apartment 9H on the 10th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.

8 PETER COOPER ROAD, Manhattan
78KJun 3

PROPOSED METAL CORNICE REMOVAL AND FACADE RESTORATION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

9 WEST 137 STREET, Manhattan
20KJun 3

PROPOSED METAL CORNICE REMOVAL AND FACADE RESTORATION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

7 WEST 137 STREET, Manhattan
20KJun 3

ALTCO TO CONVERT OFFICE AND SHOWROOM FROM USE GROUP 6 TO YESHIVA UNIVERSITY KATZ SCHOOL OF MEDICINE AND HEALTH IN USE GROUP III(B) AS PER THE PLANS FILED HEREWITH. EGRESS ANC CHANGE OF USE UNDER THIS APPLICATION. ALL WORK PERFORMED UNDER APP#M01257148.

205 LEXINGTON AVENUE, Manhattan
20KJun 3

INTERIOR RENOVATIONS OF EXISTING COMMERCIAL OFFICE SPACE WORK TO INCLUDE NEW NON-STRUCTURAL PARTITION WORK, DOORS AND ASSOCIATED FINISHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY

270 LAFAYETTE STREET, Manhattan
230KJun 3

PROPOSED OF WINDOW LINTELS, POINTING AND CRACK REPAIRS TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2155 GLEASON AVENUE, Bronx
10KJun 3

New plumbing for commercial kitchen on first floor, Kitchen hood to be provided with FDNY-approved fire suppression system under separate permit. New plumbing for bathroom on first floor. New plumbing for cellar floor bathroom and drainage.

170 7 AVENUE, Manhattan
26KJun 3

TO ERECT TWO STORY ADDITIONS AT FRONT & REAR AND RAISE ATTIC INTO A 2ND FLOOR IN THIS EXISTING 1.5 STORY 1 FAMILY DWELLING AND TO ADD AN ADU. WORK TO INCLUDE THE REMOVAL & INSTALLATION OF STRUCTURAL MEMBERS, PARTITIONS, FENESTRATION & MECHANICAL EQUIPMENT

46-27 195 STREET, Queens
416KJun 3

Plumbing work as shown on plans. No change in use, egress or occupancy.

280 EAST HOUSTON STREET, Manhattan
32KJun 3

PLUMBING WORK ON THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1260 LEXINGTON AVENUE, Manhattan
67KJun 3

Installation of HVAC Equipment as per plans filed herewith.

185 AVENUE A, Manhattan
200KJun 3