Search Permits
18,385 results · type: plumbing
Replace 1/2 rpz for the carbonator
17 tunnel to repair leaks on building drain system
Replace Kitec piping in home Replace interior domestic water supply to all fixtures. Replacement of fresh water supply from meter to residence.
40 tunnel below the foundation to replace the main drain and master bath drain lines. 2 access holes - front right
Interior renovation of existing office space B occupancy. Removal of existing wall partitions doors frames. Removal of existing ceiling tile and light fixtures. New office configuration open floor plan one conference room one breakroom and reception area
Total demo of SFR 1128 sq ft circa 1952 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Gas Test to restore gas service
35 ft tunnel underneath the home to replace rooted sewer pipe 8 ft replacement of main sewer line in yard after cleanout
Replacement of an existing water heater
Replace water line from meter to the home a total of 40 feet. Replace water lines under the foundation of pier and beam home for 2 full bathrooms kitchen and washer and water heater under the foundation.
excavate roughly 30 feet to expose/redo water line from the meter to the home Bed in new line per code use tracing wire as well as install new shut off valve/PRV and access box
Installation of exterior domestic line only
Irrigaton installation front and back
Pool and decking in back yard of residence
Total demo of 1071sqft SFR and 342 Accessory Structure built in 1950. ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Total Demo of SFR 1272sqft built 1958 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
7 DAY - INTERIOR RENOVATION OF AN EXISTING TENANT LEASE SPACE. NO CHANGE TO OCCUPANCY OR USE. THE GENERAL SCOPE OF THE PROJECT INCLUDES ALTERATION TO SELECT AREAS WITH NEW NON-LOAD BEARING PARTITIONS MILLWORK REPLACEMENT OF CIELINGS AND FINISHES. EXISTING MEP SYSTEMS TO BE MODIFIED TO SUPPORT NEW LAYOUT CONSTRUCTION AND EQUIPMENT.- OVA
New pool and spa
HEB Auston 9 Grease Trap Replacement
Total demo of 2378 SFR circa 1974
Remove existing natural gas 50 Gallon Water Heater.
BLDG 11 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Installation of the onsite Underground Fire Line piping
ePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)
sewer spot repair
ePlan: Residential Expedited Review - New Duplex Unit A New construction of a 2-Story Single Family Res. [4bed 4.5bath]
NEW CONSTRUCTION OF TWO-STORY COMMUNITY ARTS EDUCATIONAL BUILDING. Concurrent Review: SP-2024-0009C
BLDG 9 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Bldg 2 New Construction of 2-story SF Res [4bed 4bath] with attached carport
We will be excavating 2 access holes and tunneling approximately 54 feet under the slab from the front of the home following the cleanout and an additional cleanout from the back of the home near the master bathroom to expose the damaged cast iron piping from the original plumbing of the home. The fixtures that will be addressed will be the master toilet shower lavatory upstairs drop-down and kitchen. Once exposed The Bearded Plumber will complete the necessary repairs and replace the defectiv