Search Permits
210,945 results
Home builders loop Ref: 2026-057691 BP
Bldg 1A New Construction of 2-Story Single Family Res. [3bed 2.5bath] attached garage
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC System and Repair Or Rebuild Of The Supply Air Plenum
Garage Conversion-add a study in the garage increasing the square footage on the first floor from 50 to 210 sf
Chavis-Parod - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 Amps only. Requesting underground wire pull.
INTERIOR FULL FINISH OUT. EXISTING DRYWALL IS GUTTED AND CEILINGS EXPOSED. INTERIOR/EXTERIOR DOOR REPLACEMENT CABINETS DRYEWALL NEW ENGINEERED STAIRWELL RELOCATE WINDOW REPLACEMENT SHOWER RECONFIGURATION POWDER BATH AND UTILITY ROOM RECONFIGURATION. LIGHTING REPLACEMENT ONLY.
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4012 MONTAGE PASS
New Construction of Cluster Boat Dock
Emergency repair and upgrade of 125amp overhead service to new 200amp. Service had a cloth riser that burned up and AE disconnected the service and pulled meter. Work was performed and inspected on 5-29-2026
*Green Building* New 1-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
New Construction in the ETJ SFR
Interior remodel of an existing ground floor commercial space suite A within the Tree Apartments multi family residential building. Scope of work excludes kitchen back of house areas
**CREEKSTONE APART COMPLEX BLDG 5- SEWER PIPE REPAIR @ WASHER BOX**
Replacement of an existing water heater Replacing the tank gas water heater with similar model
temporary tpole for new construction in Easton Park REF: 2025-071983 BP
Plumb for master bathroom (repairing bathtub drain)* and relocate washer drain line. *No sheetrock to be removed
Not Pre-Plumbed Water Softener Install - No Electrical Work
Express- Replace drywall that was removed for plumbing and electrical repairs. Replace insulation. Tub and shower conversion. Replace 1 entry door of the same size. Plumbing and electrical permits have been issued.
Home builders loop Ref: 2026-056145 EP
New 2-story 1 bedroom 1 bathroom dwelling unit with attached carport covered porch and 2nd floor covered balcony.
Tesla wall connector installation Meter main combo feeds sub panel in garage. Charger will be fed from sub panel in garage 60a circuit
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
*Emergency* Rebuild electrical service underground. Austin Energy has already disconnected power from the house
New Construction in the ETJ SFR
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
Install Diamond Shamrock Gas Price Sign @ 20
Home builders loop Ref: 2026-015492 EP
OVERHEAD HOME BUILDER LOOP