Search Permits
12,356 results · type: electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
SOLAR PV WITH ESS
MISCELLANEOUS ELECTRICAL
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install 26kw backup generator, sub panel transfer switch combo, and dedicated gas line at existing SFR
New duplex
Install 400 amp transfer switch and 36 kw all electrical connections
New duplex
Vacancy Inspection
Electrical Service Permit- After the Fact. Permit submitted to legalized electrical work previously performed without permit. Work includes installation and verification of (1) 125 amp, 120/240v single phase electrical Serv panel serving dwelling unit apt 1A, including approximately 20 branch circuits.
Install 200 amp transfer switch switch for 30 KW generator and make all electrical connections.
Planned power outage for Rouses to assist generator tech with replacing breaker in ATS.
Utilize existing circuit for pool equipment. Bond pool.
Install new 400 AMP 3 phase transfer switch for a Generac 48 kw 3 phase 277/480 VAC generator. Install new 150 AMP wire to generator. Install new EMT conduit. No gas meter present, request 450,000 btu at standard pressure.
Wire new in ground pool
6 Month vacancy inspection. No new work performed at the property.
Electrical Service/Meter for Apt. 119
Vacancy
electrical