Search Permits
210,399 results
Home builders loop Ref: 2026-049448 EP 2026 049448 000 00 BP
Express: Tub to shower conversion in hall bathroom Replace walls in shower
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
New construction of single family dwelling with 5 bedrooms and 4.5 baths 3 car garage rear patio and front porch PUD
EV charger installation
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
Interior remodel of SFR Replacing flooring interior doors cabinets trim and plumbing fixtures. Removing wall in kitchen and creating a new closet in the primary bedroom. Relocating existing shower in primary bath and adding lighting. Replacing various windows and front door.
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
1916 S 3rd St (front unit) Residential Expedited Review - New Autofill Pool.
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
15 DAY - MULTI-LEVEL DEMO AND REMODEL OF ADMINISTRATIVE OFFICE SPACE PHASE 2 - OVA
Express: Fire damage repair - Please reference AFD incident report - Please reference Engineers report for Required repairs.
Replacement of an existing water heater new 40gal rheem NG water heater change out 8700 Neider Drive Austin TX 78749
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
Replacement of an existing water heater install new water heater 50gal ng
New 2 story single family residence 3 bedroom/2.5 bathroom with attached garage covered porch and patio
Replacement of complete existing central heat and air system with or without duct work
Tunnel under home 15 to make repairs on sewer system supporting all exposed plumbing every 4 per city code with city approved hangers.
Bldg 2 New Construction of 3-Story Single Family Res. [3bed 2.5bath]
Home builders loop Ref: 2026-015217 EP
Addition/remodel. Addition of an office sunroom covered patio and bathroom to rear of existing noncomplying 1-story single family residence. Convert existing attached garage into a bedroom and bathroom. Interior remodel. Reconfigure interior layout resulting in a 3 bedroom 3 bathroom single family residence. Retroactively permit covered front porch addition.
Express- Replace 5 existing windows- size for size.
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
Express: Replacing 4 windows like for like in existing residential home
Home builders loop Ref: 2026-056838 EP
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel - Replace Bath Valves Change Light Fixtures Update electrical INSTALL LVL BEAM
200amp panel 200amp meter base grounding and bonding
Tunnel under foundation to replace cast iron with SCH 40 PVC for 2 full bathrooms kitchen and washer drain line with 2 access holes one located in the front left side of the home the second will be made in the right side by the garage area. Total length of tunnel is approximately 65 feet. We will replace sewer line from the home to the city tap connection which is about 50 feet in the yard. We will also replace water line from the meter to the home and repipe water lines inside the home for 2 fu
Replacement of an existing water heater water heater change out 9403 Ashton Ridge Austin TX 78750