Search Permits
12,356 results · type: electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
electrical
“Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.” I would like to upgrade the electrical panel from 100A to a 200A panel
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND TESLA POWERWALL3 EPANSION UNIT. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC
This is a like for like electrical panel swap out. We will be removing the existing electrical panel and replacing a new 200 amp all in one combo unit in its place. The existing location has our 3'x3' clearance, there is no need for any relocation, and the underground 2" feed is in good condition to be used, there is no solar on the property.
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration