PermitDig

Search Permits

4,250 results · type: plumbing

Modifications to the existing plumbing system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.

100 CHURCH STREET, Manhattan
10KJun 22

RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; REPLACE 2-PC RESTROOM, NEW BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

221-53 HORACE HARDING EXPRESSWAY, Queens
60KJun 22

Remove, relocate and replace plumbing fixtures and add new fixtures.

437 EAST 80 STREET, Manhattan
46KJun 22

Modifications and additions of plumbing fixtures and piping on the BNY Facade as per plans. No change to use, egress, of occupancy.

97 BARCLAY STREET, Manhattan
1.7MJun 22

Installation of new drinking fountain relocate existing electrical water heater, replace new water closet and sink disconnect gas piping to existing mechanical unit, no change in use, occupancy or egress under this application

25-10 ULMER STREET, Queens
25KJun 22

Plumbing renovation of the 1st floor for retail build out. No change in use, egress or occupancy

250 WEST 57 STREET, Manhattan
Jun 22

REMOVE, REPLACE AND INSTALL NEW PLUMBING FIXTURES. ALL AS PER PLANS.

158 MERCER STREET, Manhattan
21KJun 22

FILE PLUMBING WORK TYPE IN CONJUNCTION WITH GC APPLICATION JOB#B01397160-I1. INSTALL NEW PLUMBING FIXTURES AT THE CELLAR 1ST 2ND AND 3RD FLOOR.

353 54 STREET, Brooklyn
84KJun 22

RESOLVE ECB VIOLATIONS: 34772038R AND 35483723K; SUPERSEDE LAA JOB #510079184; RENOVATION OF EXISTING CELLAR AND 1st FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER AND DRYER ON CELLAR; NO CHANGE IN USE, EGRESS

68 MC CLEAN AVENUE, Staten Island
68KJun 22

Legalization of plumbing work filed under BIS# 102680074 that was approved but never permitted. All work shown on the plans was completed. NO CHANGE TO USE, EGRESS OR OCUPPANCY.

43 EAST 10 STREET, Manhattan
Jun 22

TO PROPOSE PLUMBING WORK OF EXISTING RESIDENTIAL SPACE IN MIX-USE BUILDING ON 2ND & 3RD FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.

14-46 COLLEGE POINT BOULEVARD, Queens
24KJun 22

Plumbing scope of work in conjunction with tenant fit out

91-19 QUEENS BOULEVARD, Queens
20KJun 22

Plumbing work in conjunction with INTERIOR FIT-OUT OF AN EXISTING SINGLE-STORY+/-10,350 SF BUILDING CREATING (2) SEPARATE TENANT SPACES INCLUDING AN INTERIOR RETAIL BANK

37-02 JUNCTION BOULEVARD, Queens
22KJun 22

CSC#24203 PROVIDE ALL PLUMBING SYSTEM FOR COLD STONE CREAMERY WITHIN THE EXISTING BUILDING SHELL, INCLUDING WATER, SANITARY, GREASE SANITARY AND CONNECT THEM TO THE EXISTING UTILITIES. CONNECT TO EXISTING ELECTRIC STORAGE TYPE WATER HEATERS.

2303 BROADWAY, Manhattan
40KJun 22

HEREWITH FILE PLANS FOR PLUMBING WORK ASSOCIATED WITH THE RENOVATION OF APT 14A; NO CHANGE TO USE, OCCUPANCY OR EGRESS.

200 CENTRAL PARK SOUTH, Manhattan
18KJun 22

PLUMBING WORK FOR EXISTING EATING & DRINKING ESTABLISHMENT AT 1ST. FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.

45-55 VAN DAM STREET, Queens
42KJun 22

MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS IN 25TH AND 28TH FLOOR COMMERCIAL OFFICE SPACES. NO CHANGE TO USE, OCCUPANCY OR EGRESS

140 EAST 45 STREET, Manhattan
90KJun 22

REPLACE EXISTING COMMERCIAL KITCHEN FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

25-79 FRANCIS LEWIS BOULEVARD, Queens
9KJun 22

FITOUT OF AN EXISTING STORE INTO A COFFEE SHOP WITH NEW APPLIANCES, ELECTRIC HOT WATER HEATER, AND ASSOCIATED PIPING.

257 3 AVENUE, Brooklyn
27KJun 22

Interior plumbing work for restaurant with commercial kitchen on Floor-1 and cellar

303 PARK AVENUE SOUTH, Manhattan
140KJun 22

INSTALL HOUSE CONNECTION AT OSP IN CONJUNCTION WITH JOB#Q01213157

64-20 BELL BOULEVARD, Queens
25KJun 22

CAP & REMOVED ILLEGAL BATHROOM & KITCHEN FIXTURES WITH PIPING AT CELLAR TO CURE ECB VIOLATIONS#39176631Z;39176629J;39176628H;39176630R

49-08 93 STREET, Queens
28KJun 22

PROPOSED PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION AT 1ST & 2ND FLOOR. DIRECT REPLACEMENT OF PLUMBING FIXTURES, REPLACE HWH & BOILER, ADD NEW GAS DRYER.

732 ROSEDALE AVENUE, Bronx
69KJun 22

Interior renovation of the second bathroom for apartment PH31 AB, work includes replacing the plumbing fixtures in the existing roughing. No change in use, egress, or occupancy is involved.

2 RIVER TERRACE, Manhattan
33KJun 22

Filing for plumbing work as per plans. No change in use, egress, or occupancy.

87-02 144 STREET, Queens
40KJun 22

Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.

51 MADISON AVENUE, Manhattan
130KJun 22

PLUMBING MODIFICATIONS AS RELATED TO INTERIOR RENOVATION. NO CHANGES TO USE, OCCUPANCY OR EGRESS. SCOPEINCLUDES REMOVAL OF EXISTING APPLIANCES & PLUMBING FIXTURES, AND INSTALLATION OF NEW APPLIANCES AND PLUMBINGFIXTURES WITH NEW PIPES AND CONNECTIONS AS R

315 WEST 106 STREET, Manhattan
28KJun 22

Remove, replace or install plumbing fixtures in conjunction with GC application #B01380914-I1.

764 CONEY ISLAND AVENUE, Brooklyn
88KJun 22

FILED THIS APPLICATION TO RESOLVE THE VIOLATION # 39109643X. LEGALIZED PLUMBING FIXTURES @ 1ST & 2ND FLOOR OF ONE FAMILY DWELLING UNIT. NO CHANGE IN USE OF EGRESS & OCCUPANCY.

171-09 144 AVENUE, Queens
Jun 22

Filing plans herewith for the installation of (1) floor drain associated with the proposed addition of new exterior walk-in cooler/freezer at rear of building. No change to use, egress, or occupancy

1380 BROADWAY, Brooklyn
15KJun 22