Search Permits
18,385 results · type: plumbing
PLUMBING WORK OF EXIST. LAUNDRY ESTABLISHMENT WITH, REPLACE/NEW DRYER, WASHER, SINK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS.
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
Herewith file plans to renovate bathroom and kitchen in apartment 6. Replace and install new plumbing fixtures. No change to use egress or occupancy
PLUMBING PLANS FILED HEREWITH TO SHOW INTERIOR RENOVATION OF 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREIWTH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Propose plumbing work of existing residential building as per plan. No change in use, egress, or occupancy.
excavate and remove cracked/damaged storm drain and replace with schedule 40 PVC
ePlan: Residential Expedited Review - New Duplex Unit B New construction of a 2-Story SF Res [1bed 2bath] with attached Garage
Addition/Remodel to existing 1-story single family residence 3 bed/2 bath expanding master bedroom with bathroom and kitchen. Replacing carport. Relocating interior walls
Total Demo of a SFR 1061 sqft built in 1958 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Total demo of sfr 900 sqft circa 1952
Installation of underground fireline
UNIT C DUPLEX - UNIT 1023 - EACH UNIT WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
*PARTIAL DEMO* ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 3.5bath] Work to include: First floor Interior remodel First Floor Addition New Front Porch Repair Existing Wood Deck Addition Existing rear non-complying covered deck to be demolished.
Excavate 15 tunnel to repair main drain line under house
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath] with Office Covered Porch Covered Patio and Attached Garage
Installation of Sewer Yard Line Water Yard Line and Reclaimed Water Tie-In
BLDG 20 - UNIT C DUPLEX (UNIT 1022-1025) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
ePlan: Residential Expedited Review - Two Unit - Bldg 1 New Construction of 2-story SF Res [4bed 4bath] with attached carport
New pool spa and concrete deck
Express: replace existing wet space with new walk in shower including new valve and prefabricated acrylic walls Like for like.
7 DAY - INTERIOR REMODEL OF EXISTING RESTAURANT WITH NEW KITCHEN EQUIPMENT HOOD AND GREASE TRAP. - OVA
BLDG 10 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Change of Use from Fitness to Coffee Shop - Interior finish-out and renovation of an existing tenant space for a coffee shop. Scope includes construction of customer seating and service areas barista station food preparation area restrooms storage mechanical electrical and plumbing modifications accessibility
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [5bed 4bath] with habitable attic and attached garage
Addition of exterior awning at rear Interior remodel with replacement doors and windows. Structural work is proposed at living room to accommodate a wider unit remove and replace backer board waterproofing tile and fixtures in 3 existing bathrooms. Update interior doors baseboards new flooring new staircase guardrail changing interior walls in master bedroom to make the bedroom smaller and the walk-in closet larger.
Installing a new irrigation system
Excavate 60 tunnel to repair main drain line under house
Perform an under-slab sanitary sewer repair using the tunneling method to access and repair a break serving one bathroom group. The initial repair is anticipated to involve approximately 25 feet of horizontal sanitary sewer piping.
Trenchless Water Line Replacement from house to water meter