Search Permits
208,714 results
Replacement of complete existing central heat and air system with or without duct work
Boone S413 C Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Interior remodel to create a spec. suite [7 Day Review]
Electrical service to a lift station( New Manville Standpipe Power)
TPOLE REF BP # 2026-048337
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of New Shell Space for future Restaurant.
PARTIAL DEMOLITION / ADDITION / REMODEL OF A 2-STORY WOOD FRAME HOUSE. ADDING 51.26 SF AND REMODELING 2109.82 SF. STONE & SIDING VENEER METAL ROOF FINISHED HOUSE.
Replace 200amp panels replacing both meters junction gutter box grounding system and surge protection for both unit A and B Electric Provider - Austin Electric
Trench and replace sewer yard line from cleanout to city tap location.
Express: Foundation repair
New SFR 2- Story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio PUD
Connect Mobile Home with decks 80 sq ft
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Three Unit - Bldg 2 New Construction of 2-Story SF Res [3bed 2.5bath] w/ attached garage
Total demo of SFR 4490 sq ft circa 1929 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
In 137.5 KW Solar System with 250 ALEX-550-W panels and 2 SCA60KTL-DO inverters
Express- Foundation repair on a pier and beam structure. Install 18 spread footing sonotube piers and 98 of 4x6 beam for support. Improve level.
Tunnel approx 30ft under home to re-route kitchen sink drain line to front of house and connect.
Exterior modifications for expanded pet relief 2026 012313 DA - Approved
INSTALL FACE-LIT CHANNEL LETTERS ON BACKER READING TACODELI ON EAST ELEVATION
HOME BUILDERS LOOP for New SFR COA BP: 2026-043388 & 2026-043389
Express- Tub to shower conversion in master bath
UNIT 201: New 2nd floor unit of triplex 6.5 bathroom 6 bedroom patio & porch. Part of 2-story triplex 3-unit use.
Verizon to bring in new fiber to an existing cell site
New three-story condo duplex 4 bed 2.5 Bath with attached covered patio
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Three Unit - Bldg 3 New Construction of 2-Story SF Res [3bed 2.5bath] w/ attached garage
Replacement of an existing water heater 40gal gas tank located in a closet
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
New three-story condo duplex 4 bed 2.5 Bath with attached covered patio