PermitDig

Search Permits

208,714 results

reroofing no hot works

1913 Stockton St, North Beach
5KJun 2

tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.

2065 Polk St, Russian Hill
500KJun 2

modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.

5 The Embarcadero, Financial District/South Beach
47KJun 2

install 1 non illuminated double faced, expansion bolt-anchored, projecting sign. (a)

66 Kearny St, Financial District/South Beach
4KJun 2

install 1 non illuminated single faced wall sign with individual letters attached to the exterior of the building with a tape and epoxy system: andytown coffee roasters.

66 Kearny St, Financial District/South Beach
4KJun 2

unit#: 1-3; replace (e) alum windows at front w/new insulated alum windows. no change to location to location or size. three window total. replace (e) wood shingles at front with hardie shingles.

460 Filbert St, North Beach
25KJun 2

recommencement and completion of work approved under pa#202211307425, #202301200471 & #202305057191

2975 Jackson St, Pacific Heights
155KJun 2

reroofing: remove tar & gravel roof & install modified bitumen roof, hot work. remove asphalt shingles roof & install new asphalt shingle roof.

32 Melra Ct, Visitacion Valley
16KJun 2

recommencement and completion of work approved under pa#202305117609 & #202305127701

2975 Jackson St, Pacific Heights
5KJun 2

reroofing: remove modified bitumen roof & install new modified bitumen roof (hot works.) remove asphalt shingle roof & install new asphalt shingle roof.

1352 34th Av, Sunset/Parkside
20KJun 2

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

2201 14th Av, West of Twin Peaks
13KJun 2

g/f: office tenant retrofit "1 for 1". replacement of existing florescent fixtures, new lighting control devices and associated wiring. new power receptacles and associated wiring.

325 Pacific Av, Chinatown
60KJun 2

solar permit: installing 10 solar pv modules, 410 watts per module, total no. of rating 4.1 kw. mounted: roof, ballasted: n | new 4.1 kw pv and convert existing pv to enphase

568 Alvarado St, Noe Valley
19KJun 2

install 1 halo illuminated chanel letter walls sign "anderrsen horowitz" 18.5" x 260.3", 2" thickness

180 Townsend St, Financial District/South Beach
16KJun 2

reroofing: replace (e) roof (flat roof) w/180 gta torch down granulated material.

929 Wisconsin St, Potrero Hill
14KJun 2

1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain.

1100 Ellis St, Western Addition
100KJun 2

to comply with nov202302664: legalize increased roof height at rear 10ft of the building. at 3/f & kitchen relocation.

1521 Hudson Av, Bayview Hunters Point
5KJun 2

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

2921 20th St, Mission
8KJun 2

revision to pa# 202510237986. change two drilled piers to hand dug piers. no exterior work.

1310 Scott St, Western Addition
0KJun 2

new rated window along property line, visible from street.

227 Congo St, West of Twin Peaks
0KJun 2

Eastland S352 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.

9405 CORVALLIS DR, AUSTIN
Jun 1

Disconnect the generator and cap off the wiring in a junction box. Transfer switch to remain in place.

6103 CHERRYLAWN CIR, AUSTIN
Jun 1

Interior Remodel- minor changes to structural framing updates to electrical plumbing hvac.

504 E 38TH HALF ST, AUSTIN
Jun 1

Connect Mobile Home and add Decks 4x4 and 8x8

1407 ESTRELLAS DR UNIT B, AUSTIN
Jun 1

ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of New Parking Garage.

2545 BROCKTON DR BLDG GAR, AUSTIN
Jun 1

New pool and spa

1307 W ST JOHNS AVE, AUSTIN
Jun 1

ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage

8406 COSMICO ST, AUSTIN
Jun 1

Covered patio addition to existing structure. Garage conversion from garage into storage space with a full bathroom.

209 NELRAY BLVD, AUSTIN
Jun 1

NEW 5 STORY HOTEL 79564 sf

12221 TECH RIDGE BLVD, AUSTIN
Jun 1

ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage

8402 COSMICO ST, AUSTIN
Jun 1