Search Permits
208,714 results
reroofing no hot works
tenant improvement of an existing restaurant and bar, includes new i terior non-structural partitions, finishes, lighting, millwork, and kitchen equipment> replace exterior storefront windows and entry door. provide associated mep upgrades.
modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.
install 1 non illuminated double faced, expansion bolt-anchored, projecting sign. (a)
install 1 non illuminated single faced wall sign with individual letters attached to the exterior of the building with a tape and epoxy system: andytown coffee roasters.
unit#: 1-3; replace (e) alum windows at front w/new insulated alum windows. no change to location to location or size. three window total. replace (e) wood shingles at front with hardie shingles.
recommencement and completion of work approved under pa#202211307425, #202301200471 & #202305057191
reroofing: remove tar & gravel roof & install modified bitumen roof, hot work. remove asphalt shingles roof & install new asphalt shingle roof.
recommencement and completion of work approved under pa#202305117609 & #202305127701
reroofing: remove modified bitumen roof & install new modified bitumen roof (hot works.) remove asphalt shingle roof & install new asphalt shingle roof.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
g/f: office tenant retrofit "1 for 1". replacement of existing florescent fixtures, new lighting control devices and associated wiring. new power receptacles and associated wiring.
solar permit: installing 10 solar pv modules, 410 watts per module, total no. of rating 4.1 kw. mounted: roof, ballasted: n | new 4.1 kw pv and convert existing pv to enphase
install 1 halo illuminated chanel letter walls sign "anderrsen horowitz" 18.5" x 260.3", 2" thickness
reroofing: replace (e) roof (flat roof) w/180 gta torch down granulated material.
1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain.
to comply with nov202302664: legalize increased roof height at rear 10ft of the building. at 3/f & kitchen relocation.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to pa# 202510237986. change two drilled piers to hand dug piers. no exterior work.
new rated window along property line, visible from street.
Eastland S352 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Disconnect the generator and cap off the wiring in a junction box. Transfer switch to remain in place.
Interior Remodel- minor changes to structural framing updates to electrical plumbing hvac.
Connect Mobile Home and add Decks 4x4 and 8x8
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of New Parking Garage.
New pool and spa
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage
Covered patio addition to existing structure. Garage conversion from garage into storage space with a full bathroom.
NEW 5 STORY HOTEL 79564 sf
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A583 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 1 car garage