PermitDig

Search Permits

208,714 results

ground floor: this project consists of a tenant improvement to an (e) food facility (formerly starbucks) with no change in occupancy classification, no expansion of floor area, and no modification to building structure. swapping equipment and decor/colors. light fixtures.

689 Townsend St, Mission Bay
30KJun 2

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

1832 24th Av, Sunset/Parkside
18KJun 2

revision to pa# 202605191576: no longer doing a bathroom remodel, instead doing a kitchen remodel. insulation and drywall installation in main level ceiling. replace old duct system & install new duct work, including supply/return ducts, plenums. ducts are located in garage.

3530 22nd St, Noe Valley
5KJun 2

removal of (e) wall at 2/f dining area. like for like kitchen remodel.

12 Carnelian Wy, Noe Valley
30KJun 2

unit #8c - bathroom remodel, same layout.

239 Brannan St, Financial District/South Beach
25KJun 2

9/f: rev 202512040978 to add illuminated exit signage to t.i. electrical deferred under this permit.

33 New Montgomery St, Financial District/South Beach
55KJun 2

revision to permit 202605040598. adding 21" corner vanity. replacing sliding door to pocket door (no change to size)

4042 17th St, Castro/Upper Market
15KJun 2

install new single faced non electric sign. (muse acai & smoothie bar)

2220 Chestnut St, Marina
4KJun 2

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

2472 14th Av, West of Twin Peaks
21KJun 2

partial kitchen remodel. (new countertop psiny cabinets). 2 bathroom remodel in kind. replace floors, modernize laundry - add door to laundry closet.

1416 25th Av, Sunset/Parkside
75KJun 2

change the usage of the family room and the backyard entrance room to bedroom. add new door to garage wall to separate bedroom from garage.

1827 32nd Av, Sunset/Parkside
1KJun 2

rev to s20251205378: solar permit: installing 16 solar pv modules, 410 watts per module, total rating 6.56 kw. mounted: roof, including 1 energy storage unit, with 13.5 kwh in capacity, ess units will not be closer than 3 feet

18 Bonview St, Bernal Heights
Jun 2

revision to permit 202605040601. adding 16" vanity. replacing sliding door to pocket door (no change to size)

4040 17th St, Castro/Upper Market
15KJun 2

recommencement and completion of work approved under pa# 201805017932, 202401053529, 202504305558.

2755 Harrison St, Mission
111KJun 2

recommencement and completion of work approved under pa# 202408198997 & 202504305560.

2755 Harrison St, Mission
15KJun 2

2-story rear horizontal addition and reconfigured rear deck and stairs full interior renovations at existing floors 01, 02. new interior stairs.xcavation of approximately 71 cu.yd.existing front street facade to remain, no work.

1030 Sanchez St, Noe Valley
488KJun 2

replace (e) vanity in an existing, accessible bathroom of a vacant tenant space (former restaurant) kon the 1/f and installation of a toilet room door sign in compliance with cbc chapter 11b-703.7.2.6.3.

646 Washington St, Chinatown
1KJun 2

drywall repairs, painting, comply nov# 202656605

1100 Ocean Av, West of Twin Peaks
2KJun 2

revision to 202603318609: change from curb footing to underpinned footing.

1207 Arguello Bl, Inner Sunset
0KJun 2

unit#14h: kitchen cabinets and countertops replacement in kind, two bathrooms tile replacement, no architectural change.

501 Beale St, Financial District/South Beach
90KJun 2

facade finishes entry lobby + elevator cab finishes, interior partitions + interior finishes + plumbing + lighting.

1035 Battery St, Financial District/South Beach
600KJun 2

unit 213, 313 and 413: install insulation, drywall, doors, flooring, trim where missing prime & painted affected area

172 06th St, South of Market
50KJun 2

units 1a,1h,5h,5j: kitchen and bathroom remodels for all units, no change to walls and layouts. no structural work, no changes to doors & windows.

8 Locksley Av, Inner Sunset
80KJun 2

comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom.

433 Oak Park Dr, Inner Sunset
92KJun 2

installation of a new 75 kva transformers and 200 amp panel on existing infrasture. intallation of 3 new charge point. ev chargers.

655 Beach St, Russian Hill
15KJun 2

to obtain final inspection for work approved under pa# 201510270960. all work is complete.

140 South Van Ness Av, Mission
0KJun 2

waterproof 6ft of foundation.

905 Russia Av, Excelsior
4KJun 2

remove (e), rear yard tent structure that was constructed under p/a 2012-0917-9958 (that covers a dining table permitted under 2011-0513-6025) with a 14¿x20¿x10¿ tall, aluminum-framed pergolas supported by 5 aluminum tube footings on an isolated concrete pad foundation system.

319 Divisadero St, Haight Ashbury
52KJun 2

deferred electrical plans for pa #202604179653

1100 Ellis St, Western Addition
86KJun 2

revision to permit 202211086122-s1. remove concrete spiral stairs at rear from scope of work. garage post to remain.

66 Alpine Tr, Haight Ashbury
0KJun 2