Search Permits
12,111 results · type: mechanical
6 month vacancy gas inspection
6 month gas pressure test and vacancy permit and inspection
5 ton heat pump
3 ton gas system replacement
3 ton furnace replacement
4 ton gas system replacement
3 ton condenser replacement
3.5 gas system replacement
3 ton heat pump replacement
We will replace 2 existing 12.5 ton package roof top units, using existing ductwork.
AC install and duct work
6 mo gas test & new water heater
mechanical
mechanical
Use of telehandler for SOE and foundation construction. This application is filed in conjunction with NB M01139026-I1
Use of telehandler for SOE and foundation construction. This application is filed in conjunction with NBQ00995866-I1
Use of Knuckleboom for SOE and foundation construction. This application is filed in conjunction with NB M01139026-I1
Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 7,000 LB SINGLE PERSONNEL HOIST CARS AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Install a roof-mounted condensing unit on existing dunnage.
(2) 4-ton split system air conditioning systems, bathroom & kitchen exhaust
Install Air cooled VRF heat pump condensing unit with 4 hi wall units for heating and cooling. Install ERV for ventilation. Remove existing exhaust fan and associated ductwork.
Extend existing commercial kitchen exhaust ducting at roof and install directed terminal discharge. Extend existing masonry chimney for boilers as shown on M01024656-I1. Cap unused fireplace flue at roof.
Filing to install Pizzeria Kitchen hood and ductwork as per plans. No change in use, egress or occupancy.
INSTALL INDOOR AND OUTDOOR UNIT HVAC ON UNIT 20A AND 21A OF EXIST. 20 STORIES BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Mechanical work on the 8th floor (NYSA) as indicated on drawings.
MECHANICAL FILING FOR KITCHEN EXHAUSTHOOD IN CONJUNCTION WITH ALT-1 FILING TO ENLARGE THE 1ST. FLOOR AND ADD A NEW THIRD FLOOR.