Search Permits
208,429 results
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Filing for limited Facade Repair as shown on plans. No change in use, egress or occupancy.
PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION #B01396919 & ALT 1 APPLICATION #B01404576 FOR RENOVATION IN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
MODIFICATION OF THE EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Temporary Standpipe work type hereby filed in conjunction with NB application #3321588091
INTERIOR RENOVATION ON 4TH FLOOR APT. 6 AND 5TH FLOOR APT. 8 AS PER PLAN. NO CHANGE IN USE AND OCCUPANCY.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Restoration of the brick facade at the back of building and some roofing replacement/repair as shown on drawings. No change in use, egress or occupancy.
RECONNECT EXISTING LOW PRESSURE GAS LINE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT FOR A 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT FOR A 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
re pointing and stucco reinstallation as per plan. no change in use, egress or occupancy with this application
FACADE REPAIRS
General construction for interior renovation of Apartment 10B on the 11th floor as show on drawings filed herewith. No change in use, egress or occupancy.
REMOVAL OF ILLEGAL PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH TO REMEDY ECB VIOLATION #39125134H. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PLUMBING WORK FOR EXISTING APARTMENT#1C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
The scope of work consists of verifying existing conditions of the gas lines, ensuring distributions are all compliant with PL codes, removing the existing grill, and installing new fryers. A licensed plumber should perform a gas pressure test.
HMT Quest: MODIFICATION OF HVAC EQUIPMENT, PIPING AND DUCTWORK TO ACCOMMODATE THE MAKE-UP AIR PROJECT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
PROPOSED INTERIOR PARTITIONS WORK ON 10TH FLOOR AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF ENERGY RECOVERY VENTILATOR WITH DUCTWORK AND AIR CONDITIONING SYSTEM.
RESTORE CELLAR TO PREVIOUS LEGAL CONDITION AS PER THE PLANS FILED HEREWITH TO REMEDY ECB VIOLATION #39125134H. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
NEW, REPLACED, AND RELOCATED FIXTURES, PIPING, PLUMBING EQUIPMENT WILL BE INSTALLED AND CONNECTED BACK INTO THE EXISTING TO REMAIN WATER SUPPLY AND WASTE SYSTEM. NO CHANGE TO OCCUPANCY. USE OR EGRESS.
General construction for interior renovation of Apartment 0MA on the 1st floor as shown on drawings filed herewith. No change in use, egress or occupancy.
INSTALL NEW CONSTRUCTION WOOD FENCE AT OPEN SPACE.
INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 7 MODULES, 3.045KW
General construction for interior renovation of Apartment 1A on the 2nd floor as shown on drawings filed herewith. No change in use, egress or occupancy.
BK EASTERN PARKWAY LIB - SOE SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# 321590738, NO CHANGE IN USE, OCCUPANCY OR EGRESS
Filing to repair and replace interior stairs at the same location and to repair the roof. This filing will be no change in use, egress, or occupancy.
TO PROPOSE PLUMBING & GAS WORK AT EXISTING 2-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB Q01372532-I1 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.