PermitDig

Search Permits

208,429 results

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

37-54 82 STREET, Queens
3KJun 3

MATERIAL HOIST. FOR MATERIALS ONLY. NO WORK FROM HOIST.

420 WEST 23 STREET, Manhattan
Jun 3

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

15 EAST 91 STREET, Manhattan
10KJun 3

Application for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.

1420 AMSTERDAM AVENUE, Manhattan
Jun 3

Installation of temporary supported scaffold and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

988 5 AVENUE, Manhattan
0KJun 3

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

15 EAST 91 STREET, Manhattan
10KJun 3

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

109 PRINCE STREET, Manhattan
4KJun 3

FACADE RESTORATION, INSPECTIONS

4761 BROADWAY, Manhattan
Jun 3

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

134 DEGRAW STREET, Brooklyn
5KJun 3

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

465 ST ANNS AVENUE, Bronx
1KJun 3

Application for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.

545 WEST 126 STREET, Manhattan
Jun 3

Installation of temporary supported scaffold and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

988 5 AVENUE, Manhattan
0KJun 3

INSTALLATION OF HEAVY DUTY SIDEWALK SHED.. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC

4-12 49 AVENUE, Queens
36KJun 3

HEREWITH FILING FOR NEW MECHANICAL SYSTEMS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

58-50 52 AVENUE, Queens
67KJun 3

SUSPENDED SCAFFOLD AND HOIST INSTALLATION FOREXTERIOR WORK.

370 CYPRESS AVENUE, Bronx
Jun 3

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1183 PUTNAM AVENUE, Brooklyn
6KJun 3

Installation of solar panels, rooftop, grid tied, railed, 9 modules, 3.69 KW

1689 EAST 55 STREET, Brooklyn
18KJun 3

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

536 HENRY STREET, Brooklyn
5KJun 3

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

218 WEST 18 STREET, Manhattan
12KJun 3

INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT, INCLUDING OUTRIGGER BEAMS, TIEBACKS, SAFETY LINES, AND ASSOCIATED RIGGING COMPONENTS, TO PROVIDE ACCESS FOR EXTERIOR FACADE INSPECTION, MAINTENANCE, AND/OR REPAIR WORK.

150 COLUMBUS AVENUE, Manhattan
Jun 3

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS IN ORDER TO PAINT THE FACADE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

227 SOUTH 1 STREET, Brooklyn
27KJun 3

Installation of temporary plywood enclosure with scaffold stair tower. Work shall comply with BC2022 chapter 33. No change in use, egress and/or occupancy with this filing.

1116 AMSTERDAM AVENUE, Manhattan
0KJun 3

INSTALL DEBRIS CHUTE AS PER PLAN IN CONJUNCTION WITH BUILDING DEMOLITION

88 EAST 49 STREET, Brooklyn
6KJun 3

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

181 MCGUINNESS BOULEVARD, Brooklyn
8KJun 3

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

2276 ARTHUR AVENUE, Bronx
5KJun 3

INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

140A 58 STREET, Brooklyn
1.3MJun 3

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

598 MARCY AVENUE, Brooklyn
11KJun 3

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

1118 GRAND CONCOURSE, Bronx
5KJun 3

Installation of suspended scaffold for facade inspection/repair.

31 WEST 71 STREET, Manhattan
Jun 3

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

228 WEST 71 STREET, Manhattan
Jun 3