Search Permits
12,109 results · type: mechanical
Demo unpermitted front porch rear sun room and extra drive way approach. CAUTION: code enforcement violation notated asbestos tiles installed in closet. Spoke with the builder and informed him we will need a 3rd party inspection report uploaded to the building permit attachments noting that all asbestos has been removed and the property is safe to enter prior to any further inspections. -CM 6/24/26
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton 2 Stage Gas Horizontal System (Upstairs)
Replacement of any self-contained packaged units Replacement of 5x like-for-like rooftop units. The units are 2x 3-Tons 2x 5-Tons and 1x 7.5-Tons.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Addition and remodel The project includes an addition of 643 square feet on the second floor. Work will involve modifying an existing first-floor closet to construct a new stairway. The new second-floor addition will include one bedroom a living area a washer/dryer (W/D) area and a balcony.
Express: replace 2 windows; replace AC coil and condenser; bring water heater up to code; replace 1 ceiling fan and 1 light on a bedroom
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Change out of Lennox 2.0 Ton Merit (Horizontal) Heat Pump
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacing like for like 3T Vertical Gas System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Gas Horizontal System (Main) LIKE FOR LIKE: 2 Ton 2 Stage Gas Horizontal (Master/Bedrooms) **TWO SYSTEM CHANGE OUT**
Replacement of complete existing central heat and air system with or without duct work **LORRAINE ATHERTON: Replacing like for like 2.5t gas; no structural change
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 Ton Heat Pump System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC changeout/alteration: replace existing 1.5-ton fur-down split system
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. 923 Cardinal Ln
ePlan: Commercial Expedited Review - Interior Remodel -Sec 3 Floors 3-4 (38300 SF).
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Vertical Gas System
Proposed addition to be built on the rear of the house. Interior remodel as per plans. Rolling in expired permit [2017-039423].
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacing 1-5 ton package unit - no modifications and no duct work
Replacement of complete existing central heat and air system with or without duct work Replacing like for like 4t horizontal gas system.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work replacing like for like 2.5T Furdown
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work No duct work.