Search Permits
18,993 results · type: plumbing
PL WORK IN EXISTING APT FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MINOR PLUMBING PLANS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. GC WORK FILED UNDER APPLICATION# M01237827-I1 AND MECHANICAL WORK WAS FILED UNDER APPLICATION#M01237828-I1.
FILING FOR PLUMBING INTERIOR ALTERATION FOR TENANT FITOUT AS PER PLANS NO TO CHANGE USE EGRESS OR OCCUPANCY
REPLACE AND RELOCATE KITCHEN AND BATHROOM FIXTURES. NEW SHOWER, LAVATORY AND WC. NEW BRANCHES HOT & COLD, NEW SHOWER BODY. REPLACE ANY ROTTED WASTE LINES.
PLANS AND DOCUMENTS FILED TO INSTALL STORMWATER DETENTION SYSTEM AND ASSOCIATED DRAINS AND PIPES.
PLUMBING WORK FOR RENOVATIONS OF THE 9TH FL APARTMENT AS PER PLANS FILED HEREWITH.
Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy.
Propose plumbing and sprinkler work as per drawings filed herewith. No change in use, egress or occupancy.
REPLACE ALL SANITARY BRANCH PIPING THAT IS ACCESSIBLE WITHIN THE APARTMENT, REPLACE EXISTING FIXTURE WITH NEW FIXTURE -4 WC,3Showers, 2 Lavs and 1 Tub
PLUMBING WORK FOR APT 6E AS PER PLANS FILED HEREWITH. GENERAL CONSTRUCTION WORK FILED UNDER SEPARATE DOB NOW APPLICATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Installation of new gas piping from basement to facade to roof. No change in use, egress or occupancy.
PROPOSED PLUMBING FIXTURES AT 3RD AND 4TH FLOOR UNITS, NO CHG OF USE , EGRESS OR OCCUPANCY
EZ Bathroom & Kitchen Remodel
Alterations
New Construction or Additions
New Construction or Additions
Alterations
Alterations
EZ Bathroom & Kitchen Remodel
Alterations
Alterations
New Construction or Additions
EZ Bathroom & Kitchen Remodel
Alterations
Alterations
Alterations
EZ Bathroom & Kitchen Remodel
Alterations
Alterations
EZ Bathroom & Kitchen Remodel