Search Permits
208,269 results
interior alteration including removal of (e) fireplace, new level 2 bath tub/shower replacement, full level 3 bath renovation along with a new half bath.
to comply w/ complaint # 202656190: to document existing kitchen and bathroom improvements, no new work to be completed. permit requested to update city records per inspector laura torres. all work was in kind.
revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing.
revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318.
to obtain final inspection for work approved under pa# 200409204557. all work is complete.
perform maintenance to general ad sign as spec=ified in attached engineering plans in accordance with planning code section 604
10 x 14 foot koi pond with 8x5 wetland filter will be installed in backyard. the pond will have increaing depth shelves with each shelf being about 1 foot long and adding 6-18 inch of dept to max 3 ft depth. wetland filter will be excavated to 4 feet than back filled with gravel to 6 inches. setback
reroofing 48 sqft torch down like for like
reroofing no hot works
to comply with inspection report cc 8761 to tighten post at entry way common area
reroofing no hot works
reroofing 56 sqft torch down like for like
add kitchenette at 1st fl & legalize storage in garage area.
reroof no hot works.
reroofing 3900 sqft torch down like for like
revision to permit 202401315021, change proposed curd at rear room roof to 32" parapet to coordinate with approved structural design drawings. no work visible from street.
2/f: remodel kitchen & bathroom, replace (e) finishes with 5/8" type "x" gyp bd. no wall stud demolition or construction, no change in plumbing fixture count.
revision to pa #2025-0210-0064: relocate and modify deli equipment.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
prop h - revision to permit 202411145010 for new structural footings for manufacturer suppliers climbing equipment. climbing equipment drawings submitted as reference only.
conversion of a medical cannabis dispensary to retail cannabis dispensary, for planning purposes only. no construction of physical changes to the building.
kitchen remodel to move (e) cabinets, appliances, and countertops. (n) outlets . relocate (e) plumbing and mech. construction of new door opening and fill in of existing, non-structural. renovate (e) cabinets.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
remove ceiling lath and plaster, install new insulation, construt new 2 hour rated sheetrock ceiling throughout entire unit (~2000 ish sq. ft.). for floor - ceiling unit separation
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to 202510076891: change scope, replace garage door and front door only. no bathroom remodel.
unit 209: kitchen and bathroom remodel in kind.
unit 512: kitchen and bathroom remodel in kind.
front building: install new sound proofing at the ceiling floor between ground floor and 2nd floor (except at entry stairway. no structural work req) related structural framing completed per bpa 201604255607