Search Permits
208,163 results
prop h - revision to permit 202411145010 for new structural footings for manufacturer suppliers climbing equipment. climbing equipment drawings submitted as reference only.
conversion of a medical cannabis dispensary to retail cannabis dispensary, for planning purposes only. no construction of physical changes to the building.
kitchen remodel to move (e) cabinets, appliances, and countertops. (n) outlets . relocate (e) plumbing and mech. construction of new door opening and fill in of existing, non-structural. renovate (e) cabinets.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
remove ceiling lath and plaster, install new insulation, construt new 2 hour rated sheetrock ceiling throughout entire unit (~2000 ish sq. ft.). for floor - ceiling unit separation
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to 202510076891: change scope, replace garage door and front door only. no bathroom remodel.
unit 209: kitchen and bathroom remodel in kind.
unit 512: kitchen and bathroom remodel in kind.
front building: install new sound proofing at the ceiling floor between ground floor and 2nd floor (except at entry stairway. no structural work req) related structural framing completed per bpa 201604255607
administrative permit to document change of address of pa#202503313370 from 11 frida kahlo way apn 3180-190 to 105 wisteria lane apn 3180-201.
reroofing, no hot work.
admin permit to document change of address for permit 202207289451 from 11 frida kahlo way apn 3180-190 to 505 mayor edwin lee ave apn 3180-202.
rewire whole house, repipe portions of water pipes, drywall and plaster repairs throughout home.
building f- remove and replace all doors visible from street located on private decks within the same opening. painting exterior buildings and repair and patch stucco as needed and railings. replace only canvas on patio awnings only.
revision to pa 202511129399 30-31floor - food service scope includes finishes, equipments and environmental health notes. revision includes additional lockers, drinking fountain, ceiling and soffit modifications
4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.
re-roofing. no hot works.
re-roofing. no hot works.
l 27: revision to bpa202510207709. for dph approval of level27 mk. revisions also include upgraded restroom layouts, drinking fountains + misc finishes.
comply w/ nov 202654864:auto damage repair: replace damaged studs and foundation at front wall from garage opening to south property line. replace 4" damaged studs and foundation at south property line wall. expose stucco at underside of bay window and header to confirm structural damage is present.
reroofing: remove the (e) flat roof covering anf install granule modified bitument w/smooth modified biutmen and base sheet. no hot works. remove (e) shingles and install new asphalt shingles w/synthetic underlayment.
reroofing: remove the (e) roof covering and install modified bitumen w/2 layers of base. no hot works. no work to (e) roof strctural sheathing. no work to sloped tiles @facades, @flat roof only.
remove and replace kitchen cabinets and counter w/ new in same configuration. no structural work.
2 bathroom remodels no structural changes, replacement of fixtures, one new tub and one new shower, new toilets, sink, vanities, update electrical and plumbing as needed.
new tenant improvement to operate the existing vacant restaruant & merge with existing bar lounge to be dine-in area.
temporary shoring for foundation work under pa# 202511199969
recommencement and completion of work approved under pa #202111172580.
exploritary excavation of less than 3 feet.