Search Permits
208,163 results
Mechanical work as shown on plans filed herewith. No change to use egress or occupancy.
INSTALLATION OF AN 8 FOOT HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE FOR THE DEMOLITION OF 441 PURDY AVENUE AND FOR THE NEW CONSTRUCTION OF RESIDENTIAL BUILDINGS LOCATED AT 443 & 445 PURDY AVENUE.
PLUMBING WORK IN CONJUNCTION WITH THE MISCELLANEOUS INTERIOR RENOVATION OF AN EXISTINGRESIDENTIAL UNIT 35P ON THE 35TH FLOOR OF AN EXISTING MIXED RESIDENTIAL & COMMERCIAL (RM) BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
subsequent filing for hood, MAU, exhaust fans and ductworks.
General Construction as shown on plans filed herewith. No change to use, egress or occupancy.
PLUMBING APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION #B01358768-I1
Sprinkler modifications taking place on the 1st floor lobby as per plans filed herewith. No change in use, egress or occupancy
ERECT (1) NEW ACCESSORY BUSINESS D/F BANNER AND POLE FOR GREENROW ON CANAL STREET ELEVATION.
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS GENERATOR WITH ASSOCIATED PIPING AND INSTALLATION OF STORM WATER DETENTION SYSTEM.
REPLACEMENT (2) NEW LOW PRESSURE STEAM BOILERS. REPLACEMENT (2) COMBINATION GAS/OIL BURNERS. CHANGE IN GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRES USE GROUP OR OCCUPANCY.
Application here by filled for plumbing work to be done in conjunction with application #: X01383123-I1. No change in occupancy, egress or bulk.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRES USE GROUP OR OCCUPANCY.
renovation of existing commercial space as a store at 1st floor with new partitions and finishes. No change in use, egress or occupancy.
WORK FILED TO RENOVATE APT 1L, 1R AND 2L AND TO CONNECT THE FIRST FLOOR APARTMENT 1L WITH THE CELLAR, CREATE THE ACCESSORY AREA IN CELLAR, NEW CERTIFICATE OF OCCUPANCY REQUIRED.
SUBSEQUENT FILING FOR UNDERPINNING WORK IN CONJUNCTION TO NB FILING # X01207746-I1
INTERIOR RENOVATION OF A COMMERCIAL SPACE @ CELLAR & 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Structural work in conjunction to the ALT-CO application #B01316543-I1
New four (4) Story Residential Building
FILED THIS APPLICATION TO RESOLVE THE ECB VIOLATION # 34259745Z. RENOVATION WORK INVOLVED ONLY @ CELLAR FLOOR. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Subsequent Structural filing for New Building
Subsequent Filing Foundation and Earthwork for New Building
Modifications of existing HVAC system for space 0175 - Applebees
Modification to Plumbing systems as per plans filed herewith.
sistering of existing wood joist with new wood joist on the first and second floor as indicated on the plan. Install replacement steel lintels in cellar as per plan.
Interior build-out within existing building envelope including installation of new storefront system for new eating and drinking establishment. Space 0175 - Applebees
Installation of 35.425 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 41.965 kw solar energy system on roof. No change of occupancy, use or egress.
INSTALL A NEW COMMERCIAL KITCHEN EXHAUST HOOD, DUCTWORK AT KITCHEN AND EXHAUST FAN ON THE ROOF, FIRE SUPPRESSION SYSTEM IS DONE BY OTHERS, THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of 42.51 kw solar energy system on roof. No change of occupancy, use or egress.