Search Permits
13,650 results · type: plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Main bathroom tub-to-shower conversion with 60x42 low-profile preformed shower base right drain, no drain relocation, no structural changes.
Installation of 120-ft of 2-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 400K BTU pool heater. All gas lines are to be installed per 2024 IFGC & COM gas requirements. Contact COM gas engineering at 480-644-2909 to determine if the meter needs to be upgraded.
Tub to Shower conversion in Master Bathroom - Replace existing wet space with new shower including new valve and prefabricated acrylic walls.
plumbing
plumbing
plumbing
plumbing
plumbing
Alterations
Alterations
EZ Bathroom & Kitchen Remodel
Alterations