PermitDig

Search Permits

18,993 results · type: plumbing

New pool and spa

5407 SHOAL CREEK BLVD, AUSTIN
Jun 19

Spot repair on existing sewer yard line. Less than 10 ft.

1209 TAYLOR ST, AUSTIN
Jun 19

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.

400 LAVACA ST, AUSTIN
Jun 19

Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage

7806 NAIRN DR, AUSTIN
Jun 19

Running waste and water lines from newer existing piping to new city taps recently installed on property line.

4513 AVENUE B, AUSTIN
Jun 19

Interior remodel including kitchen and bathroom updates Replacement of fixtures finishes flooring and cabinetry Interior reconfiguration in the living room area including modification of a load bearing wall. No change to building footprint or exterior walls.

1804 KENDRA CV, AUSTIN
Jun 19

irrigation for lawn

7401 PULLMAN CV, AUSTIN
Jun 19

New im-ground pool to rear of existing SFR

11408 PARKFIELD DR, AUSTIN
Jun 19

irrigation for lawn

13211 KEEFER DR, AUSTIN
Jun 19

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.

400 LAVACA ST, AUSTIN
Jun 19

Interior Finish Out to create a Medical Office

4544 S LAMAR BLVD SB UNIT 695, AUSTIN
Jun 19

Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage closet

1000 WAGON TRL BLDG B, AUSTIN
Jun 19

SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 1-STORY 4 BEDROOM WITH 3 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.

4801 BRIDWELL LN, AUSTIN
Jun 19

This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.

400 LAVACA ST, AUSTIN
Jun 19

Total Demo of SFR 2500 sqft circa 1981

3409 ROSEFINCH TRL, AUSTIN
Jun 19

Replacement of an existing water heater We are changing out the tank gas water heater for a similar model

8901 RAVELLO PASS, AUSTIN
Jun 19

New Service for SFR in ETJ

5812 TAUNTE DR, DEL VALLE
Jun 19

Express: Tub to shower (prefab base) in the same location

2212 BLALOCK DR, AUSTIN
Jun 19

CHANGE OF USE from office to dental officeinterior finish-out to add demising walls between existing office suites to create Suite 206 along with an interior remodel

6633 E US 290 HWY SVRD EB UNIT 206, AUSTIN
Jun 19

Plumbing

116 Commonwealth AV, Boston
6KJun 19

plumbing

1805 BROOKWOOD ROAD, Norfolk
0KJun 19

plumbing

3413 VERDUN AVENUE, Norfolk
0KJun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19

Alterations

2511 N 28TH ST, Philadelphia
Jun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19

Alterations

1151 S 13TH ST, Philadelphia
Jun 19

New Construction or Additions

2001 RICHMOND ST, Philadelphia
Jun 19