Search Permits
16,780 results · type: electrical
Disconnect to Reconnect required [ETJ] 125 amp panel replacement adding surge protection and grounding rods.
Electrical meter installation for New Construction of SFR in the ETJ 4000 sq ft
(Maloney Alan) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
2410AL NEW 2 STORY 4 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
ETJ new service for SFR
T-POLE Ref: 2026-118576 BP Bluebonnet
UPGRADE MAIN ELECTROICAL SERVICE
ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. Scope of Work to Include Reconfiguration of Kitchen living Bedrooms and Baths Including an Addition of One Bathroom New Foundation/Framing Roof/Exterior E/P/M work and Patio.
BASE: Installing a backup battery system and additional meter socket.
homebuilder loop Ref: 2026-115072-BP
Exterior Remodel with two new covered patio areas. No occupancy requested. No interior work.
Pinnacle Clinical Research - Install front lit channel letters mounted on a wire way. Wire and connect to existing power.
Installing new detached shade structure (256 sqft) at existing SFR. Scope of work to include electrical wiring to BBQ structure and gas meter relocation under PMT26-05813.
Install rooftop solar, battery, and solar carport
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
INSTALLATION OF 170 L.F. OF 1-IN IMC CONDUIT, 6-IN BURIAL WITH TWO - NO. 4, ONE - NO. 6 AND ONE - NO. 8 AWG THWN TO 80AMP POOL PANEL FOR A NEW 140K - 71K BTU ELECTRIC HEAT PUMP. ELECTRICAL TO BE INSTALLED PER 2023 NEC REQUIREMENTS AND SRP STANDARDS. NO RECORD ON FILE FOR EXISTING POOL CONSTRUCTED PRIOR TO RECORD KEEPING. ALTHOUGH, EFFECTIVE JANUARY 8, 2026, ALARMS ARE NO LONGER PERMITTED PER THE ADOPTED AMENDMENTS. NO NEW WORK OR CONSTRUCTION UNDER THIS PERMIT. ALL OUTLETS TO BE GFCI.
electrical
electrical
electrical
service upgrade to a 200A 120 240 V 1ph over head service
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
replace existing meter and panel with new permanent pole
TEMP POWER etj
TEMP POWER
tpole ref 2026-110840 BP