Search Permits
208,163 results
to comply with nov 202543532 to resolve upermitted work at 1st and 2nd levels. level 1 - bathroom remodel. legalize bathroom installed w/o permit, new fixtures, finishes, mep. resolve uncovered j-boxes, proper 1-hr separation. level 2 -kitchen remodel, new layout w/ fixtures, casework, finishes, mep
remodel 2 bathrooms replace in kind remodel kitchen replace in kind repair sheetrock in kind 2 bedrooms approx 8 sq ft
install (n) electrical channel letters sign facing street single sided for "soma gift shop" called sign a.
recommencement and completion of work approved under pa#201201202584
replacing bda and 18 antennas to existing building, original permit 202010287639
to obtain final inspection for work approved under pa# 201808278466. all work is complete.
comply with nov 202650957 - repair water damaged walls and flooring and ceiling in rooms # 19 and 21. use 5/8" type x sheet rock
reroof torch down
reroof torch down
unit 2687- add washer and dryer in kitchen .
level 00: tenant space build out for urgent care space. work includes new partitions, doors, restrooms, archorage for equipment, and finishes. mep included.
reroof no hot works
1) convert (e) storage to media room @ ground floor. build (n) bathroom at ground floor.
reroofing: tear off and install calss a composition shingles. no hot works.
structural design of demantable partitions. structural supplemental package to approved application 202602125795
to obtain final inspection for work approved under pa# 202412036015. all work is complete.
SP CONDO: New construction of a 2-story single family dwelling in a condo regime. 3 bedroom 2.5 bath with attached garage Revision 1: add OPTIONAL STUDY to existing floorplan (Informal Update: add Water Tap/Sewer Tap inspections for Master Meter)
Replace a 200amp exterior box for one with 40space add surge protector and proper grounding
New single family residence - 1 story 3 bed/ 2 bath 1841 sqft living with attached garage.
Wing Stop Sign A
Plumbing for New Construction of SFR in the ETJ 2703 sq ft
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
Install front-lit channel letters with backer panel TheLittleGym on East elevation
New single family residence - 2 story 4 bed/2.5 bath 2566 sqft living with attached garage
2026/06/11 - 2026/07/19 | Austin stands at a pivotal moment. In a year when the FIFA World Cup transforms North America into the center of global attention our city a capital of creativity innovation and cultural convergence deserves a worldclass celebration that reflects its identity. Austin was not selected as a host city but that reality does not diminish its spirit; instead it fuels our determination to deliver the most ambitious technically flawless and communitydriven unofficial World Cup
AE scheduled shutdown - panel repair
*SMART Housing* *Green Building* New 1-story 3 bedroom 1.5 bathroom single family residence with covered front porch and rear covered patio.
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4010 MONTAGE PASS
Express: Installation of GAF Timberline asphalt and energy shingles
Eastland S352 C Left New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.