Search Permits
208,163 results
Interior renovation of apt 3F, minor demolition of non-load bearing partitions, new doors, relocation of washer/dryer and kitchen refurbishment. All as per plans and applications. No change in use, egress or occupancy.
PLUMBING WORK ON 1ST FLOOR AND CELLAR AT A MIXED RESIDENTIAL & COMMERCIAL BUILDINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
APPLICATION FILED PROPOSED STRUCTURAL WORK AND STAIR BULKHEAD WORK. FOR STRUCTURAL WORK ONLY. ALL OTHER BE FILED UNDER SEPARATE APPLICATION
TEMPORARY SHORING APPLICATION FOR TEMPORARY SUPPORT OF THE STEEL DECKING AND CONSTRUCTION PERSONNEL AT THE 2ND FLOOR OF THE PROPOSED STRUCTURE.
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INTERIOR ALTERATIONS TO EXISTING 1ST FLOOR COMMERCIAL SPACE TO INCLUDE NEW PARTITIONS AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS. MECHANICAL (M01393254-S1) AND PLUMBING (VIA LAA) FILED UNDER SEPARATE APPLICATIONS.
NEW TOILET AND LAVATORY AT 1st FLOOR, NEW AREA DRAIN AND DRYWELL IN OSP, AND NEW 3 ROOF DRAIN ON THE ROOF
MECHANICAL MODIFICATIONS TAKING PLACE ON 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Filing for structural work and details for the reconstruction of existing fire damage stair Bulkhead. No change in use, egress or ocupancy.
Demolition of interior partitions along with existing finishes.
Demolition of interior partitions along with existing finishes.
demolition of one story house including in ground pool
Plumbing and Sprinkler scope associated with the renovation of the Media & Communication Studios at Lowenstein Hall. No change of use, egress or occupancy.
Installation of a suspended scaffold for facade inspection only as per plan submitted. No change to egress or occupancy.
PROPOSED CHANGE OF USE APPLICATION FOR UNIT M-1 ON FIRST FLOOR FROM MEDICAL OFFICE TO HOUSE OF WORSHIP.
Propose new bathroom on First floor. Replace existing bathroom fixtures in Basement floor and First floor bath.
HEREBY FILING FOR INTERIOR RENOVATION OF EXISTING APARTMENT 12K LOCATED ON THE 12TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
THE PROPOSED WORK CONSISTS OF THE REPLACEMENT OF AN EXISTING ROOF MOUNTED CONDENSING UNIT AT AN EXISTING RESIDENTIAL BUILDING. WORK SHALL INCLUDE REMOVAL AND DISPOSAL OF THE EXISTING UNIT, INSTALLATION OF THE NEW CONDENSER.
Alt. plumbing application filed as per plan provided. No change in use, egress and occupancy.
Sprinkler work for interior demolition on 4th floor.
FILING HEREWITH INSTALLATION OF NEW SPRINKLER SYSTEMS FOR RENOVATED AREAS OF THE 1ST AND 2ND FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Plumbing work filed in conjunction with M01335012-I1.
Plumbing work related to the renovation of the kitchen and bathroom #1 of apartment 15B on the 14th floor. No change to use, egress, or occupancy.
Demolition of interior partitions along with existing finishes.
Renovation of an existing apartment#8E at the 8th floor. Work includes non-structural demolition and general construction as per plan file herewith. No change to use, egress or occupancy.
Ground level canopy solar system
Scope of work is limited to the design of the anchors for banners only. There will be no change in use, egress, or occupancy.
HEREBY FILING INTERIOR GENERAL CONSTRUCTION WORK AT BASEMENT, 001-005 AT PACKER COLLEGIATE INSTITUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. RELATED MEP, STRUCTURAL AND FIRE ALARM WORK TO BE FILED SUBSEQUENTLY.
Scope of work is limited to the design of the anchors for banners only. There will be no change in use, egress, or occupancy.
PLUMBING WORK @ PARTIAL 2ND,4TH & 5TH FLOOR PLANS(APTS. #3,10 & 11) IN AN EXISTING 5 STORY W/ BASEMENT & CELLARBUILDING. NO CHANGE IN USE EGRESS OR OCCUPANCY