Search Permits
208,163 results
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Minor interior demolition. Removal and disposal of interior partitions, fixtures, suspended ceilings, floor and wall finishes, selective piping on the 1st Floor and Mezzanine Level as per plans (RG - Ted's Demo.) No change to use, egress or occupancy.
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Demo of existing transfer gilles and electric fintubes as shown on plans for office spaces at 3rd and 5th floors.
APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 19TH FL (SCL LAW EXPANSION) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
TEMPORARY WOOD CONSTRUCTION FENCE
INTERTIOR RENOVATIONS ON THE 3RD FLOOR, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Joist Sistering, Partial Demolition & Masonry Wall Repair of Existing 3-Story Landmark Building w/ Basement & Cellar (C. 1852)
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - LEGAL USE AS PER I-CARD 612835 - IN PROPERTY LINES - NAIL LAB & SPA. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Wasabi:Proposed interior fit-out of eating &drinking establishment. Work limited to interior only to include; install of new ceilings, floor, &wall finishes, non-load bearing partitions, doors, lighting, fixtures, & equip. No change in use,egress,occu,etc
INSTALL NEW BOILER AND PLUMBING FIXTURES IN THE EXISTING 3 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INTERIOR RENOVATION CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
FILING TO OBTAIN CERT. OF COMPLIANCE FOR MECHANICAL UNITS INSTALLED UNDER SIGNED OFF NB #104443602 FOR WHICH EQUIPMENT USE CARDS (CERT. OF COMPLIANCE) CANNOT BE LOCATED. NO WORK UNDER THIS APPLICATION.
Installation of suspended scaffold for facade inspection.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
EXISTING 2 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK AT THE CELLAR, BASEMENT,1ST,2ND FLOOR AND OPEN SPACE UNDER THIS APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
HVAC Design for tenant fit out. Replacement of existing HVAC units, in-kind, in-place. New ductwork throughout.
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow GENERAL CONSTRUCTION JOB#: B01391325. CAP & REMOVE PLUMBING FIXTURES & INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Re-filing entire building for Sprinkler installation. Lower first floor and upper first floor.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Temporary Installations to be used on a temporary event FIFA Watch Party - Bronx Terminal Market. All the Installations are to be removed upon completion of the event.
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM ON 1ST AND 2ND FLOOR; NEW YARD DRAIN AT FRONT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Facade Inspection
INTERIOR NON-STRUCTURAL DEMOLITION OF A 4 STORY WITH BASEMENT PER PLANS
MECHANICAL APPLICATION NEW MECHANICAL SYSTEMS THROUGHOUT BUILDING
INSTALL COMMERCIAL PLUMBING FIXTURES AND EQUIPMENT KITCHEN AT FIRST FLOOR
Temporary Installation to be used on a temporary event Advil World Cup. All the Installations are to be removed upon completion of the event.