Search Permits
12,109 results · type: mechanical
Modification to the existing HVAC system on the 8th floor as per plans (Demolition). No change to use, egress or occupancy.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, A/C UNITS AND RELATED MECHANICAL PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
New Construction
New Construction
Addition and/or Alterations
New Construction
New Construction
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
New Construction
New Construction
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Express: fire damage repair Revision: Electrical plumbing and mechanical work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Gas Horizontal System (Upstairs) LIKE FOR LIKE: 3 Ton Gas Horizontal System (Downstairs) **TWO SYSTEM CHANGE OUT**
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton 2 Stage Horizontal Gas System
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 2.5bath] with attached Carport. 52 Navasota Bldg 1
ePlan: Residential Expedited Review - New construction of a THREE UNIT RES. New construction of a 3-Story Single Family Res. [3bed 2.5bath] with attached Carport. 1310 Haskell St
Replacement of complete existing central heat and air system with or without duct work